Offshore Energy
  • news
  • test
JobsNewsletter
Offshore Energy logo
Topics
  • News
  • Contracts & Tenders
  • Authorities & Government
  • Automation
  • Business & Finance
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›Business & Finance›PEDEC: Kish Gas Field Project Moves Forward (Iran)
Business & Finance

September 9, 2013 · about 13 years ago

PEDEC: Kish Gas Field Project Moves Forward (Iran)

Head of petroleum engineering in the Development Project of Kish Gas Field talked about five environmental studies and early production from The Field by Petroleum Engineering and Development Company (PEDEC). According to Petroleum Engineering and Development Company’s (PEDEC) Public Relations (PR),

2 minutes read
  • LinkedIn
  • X
  • Email

Head of petroleum engineering in the Development Project of Kish Gas Field talked about five environmental studies and early production from The Field by Petroleum Engineering and Development Company (PEDEC).

According to Petroleum Engineering and Development Company’s (PEDEC) Public Relations (PR), Sayid Rajabzadeh said, “People of Kish Island are the clear beneficiary in this project because now we are taking the energy from Siri Island to supply electricity for Kish Island.” Adding that Kish power house receives gas from Siri via 12-inch marine pipelines. Since there are other needs for Siri’s gas for the time being, we feel the need to supply the Kish energy by its own.

He said PEDEC has planned to have 120 million cubic feet of gas per day from Cluster B in Kish Island and it takes some 12 to 15 months for planning, supplying equipment and implementation of the project, on the condition that the required equipment in the country could be supplied on time.

He also said that preparation of the transmission pipelines and other equipment for processing and sweetening of gas is on the agenda. Adding that environmental studies (EBS/EIA), gaining of the required land, bed sea study for drilling of new wells and project site, data gathering in drilling section, selecting an appropriate drilling rig and installation of the rig are all among the initial activities that have to be done before the project.

[mappress]

Press Release, September 09, 2013

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Business & FinanceProject & Tenders

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1ADES jack-up rig pair lines up drilling jobs in Nigerian and UK waters
  2. 2Odfjell Drilling’s rig remaining with Norwegian oil & gas operator for another year
  3. 3Karoon boosts Brazilian field’s oil output with all wells now online
  4. 4TotalEnergies offloading Mexican shallow water block to Grupo Carso

Related articles

FPSO Cidade de Itajaí; Source: Altera Infrastructure
Business & Finance

Karoon boosts Brazilian field’s oil output with all wells now online

23 days ago

Illustration; Source: TotalEnergies
Business & Finance

TotalEnergies offloading Mexican shallow water block to Grupo Carso

23 days ago

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

FPSO Cidade de Itajaí; Source: Altera Infrastructure
Business & Finance

Karoon boosts Brazilian field’s oil output with all wells now online

23 days ago
Illustration; Source: TotalEnergies
Business & Finance

TotalEnergies offloading Mexican shallow water block to Grupo Carso

23 days ago