Offshore Energy
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
  • More news
JobsNewsletter
Offshore Energy logo

Your trusted source for global offshore energy news, part of the Navingo network.

Topics
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
Network
  • Offshore Energy
  • Offshore Wind
  • NavalToday
  • Dredging Today
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Home›Shipbuilding›USNS Montford Point Completes Final Contract Trials
Shipbuilding

October 4, 2013 · about 13 years ago

USNS Montford Point Completes Final Contract Trials

The Navy’s first-in-class mobile landing platform, USNS Montford Point (MLP 1), successfully has completed final contract trials. Final contract trials (FCT) are the final in-depth examination of a newly constructed ship while still under warranty to the shipbuilder. FCT are conducted by the Navy’s

2 minutes read
  • LinkedIn
  • X
  • Email

The Navy’s first-in-class mobile landing platform, USNS Montford Point (MLP 1), successfully has completed final contract trials.

Final contract trials (FCT) are the final in-depth examination of a newly constructed ship while still under warranty to the shipbuilder. FCT are conducted by the Navy’s Board of Inspection and Survey (INSURV) to ensure the ship meets Navy standards and requirements and are the first trials involving the crew.

“ These trials evaluated Montford Point’s material readiness for subsequent operations, helping expand the Department of Navy’s capability for large-scale logistics movements, ” said Capt. Henry Stevens, Strategic and Theater Sealift program manager for Program Executive Office Ships. “ These successful trials support a new level of operational flexibility for critical asset infrastructure for the fleet. ”

Constructed by General Dynamics-NASSCO, Montford Point was named in honor of the 20,000 African-American Marine recruits who trained at Montford Point Camp, N.C., from 1942 to 1949. Their service prompted President Harry Truman to sign an executive order ending segregation in the U.S. military.

FCT evaluated the material condition and performance of the ship’s major systems. While underway, the ship’s crew successfully demonstrated a variety of systems including main propulsion, navigation, deck, engineering and ship control systems.

Montford Point is a highly flexible ship supporting the transfer of light and heavy vehicles and equipment at sea. Leveraging float-on/float-off technology, Montford Point is able to partially submerge to facilitate cargo movement. At 785 feet long, MLP 1 has 25,000 square feet of vehicle and equipment stowage space.

Montford Point will now conduct a series of post-delivery test and trials leading up to its post-shakedown availability in 2014. MLP 2, the future USNS John Glenn, and MLP 3, the future USNS Lewis B. Puller, are currently under construction at NASSCO.

NAVSEA, October 4, 2013

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

ShipbuildingBusiness & Finance

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Petrobras locks in 20-year US supply from Sempra’s LNG project in Lone Star State
  2. 2Hanwha Ocean’s design solution allowing LNG carrier’s switch to ammonia gets ABS’ thumbs-up
  3. 3Exmar’s FLNG conversion earns Bureau Veritas’ seal of approval
  4. 4Denmark opens EU’s first full-scale CO2 storage site

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free