Offshore Energy
  • news
  • test
JobsNewsletter
Offshore Energy logo
Topics
  • News
  • Contracts & Tenders
  • Authorities & Government
  • Automation
  • Business & Finance
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›Business & Finance›Offshore Wind Cost Reductions Achievable, Says JIP WiFi
Business & Finance

October 15, 2013 · about 13 years ago

Offshore Wind Cost Reductions Achievable, Says JIP WiFi

Wind turbines at sea could be much cheaper. The members of the Joint Industry Project ‘Wave Impact on Fixed turbine’ (JIP WiFi) are convinced that cost reductions are achievable. The design rules currently used to determine the impact of breaking waves on the turbines are very conservative. The thin

1 minutes read
  • LinkedIn
  • X
  • Email

Wind turbines at sea could be much cheaper. The members of the Joint Industry Project ‘Wave Impact on Fixed turbine’ (JIP WiFi) are convinced that cost reductions are achievable.

The design rules currently used to determine the impact of breaking waves on the turbines are very conservative. The thinking is that improving design guidelines and establishing a clearer picture of the interaction between the turbines and the maximum wave load can cut material costs by 10%.

Scale tests need to be conducted to determine the real extent of the risks

Deltares is now starting the initial scale modeling tests to look at this area, with researchers studying in high detail the impact of steep and breaking waves on the pile structure. The study will also involve an examination of the influence of currents and bed morphology. The data from the research will allow us to make a better estimate of the risks and to improve the design rules so that designers and builders of offshore wind turbines can optimise their designs.

It is still possible to participate in the project

The results will be made available to the participants during the course of 2014. The main conclusions of the research and the amendments to the design rules will be made public two years after the conclusion of the JIP.

[mappress]

Press release, October 15, 2013; Image: deltares

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Business & FinanceResearch & Development

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1ADES jack-up rig pair lines up drilling jobs in Nigerian and UK waters
  2. 2Odfjell Drilling’s rig remaining with Norwegian oil & gas operator for another year
  3. 3Karoon boosts Brazilian field’s oil output with all wells now online
  4. 4TotalEnergies offloading Mexican shallow water block to Grupo Carso

Related articles

FPSO Cidade de Itajaí; Source: Altera Infrastructure
Business & Finance

Karoon boosts Brazilian field’s oil output with all wells now online

22 days ago

Illustration; Source: TotalEnergies
Business & Finance

TotalEnergies offloading Mexican shallow water block to Grupo Carso

22 days ago

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

FPSO Cidade de Itajaí; Source: Altera Infrastructure
Business & Finance

Karoon boosts Brazilian field’s oil output with all wells now online

22 days ago
Illustration; Source: TotalEnergies
Business & Finance

TotalEnergies offloading Mexican shallow water block to Grupo Carso

22 days ago