Offshore Energy
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
  • More news
JobsNewsletter
Offshore Energy logo

Your trusted source for global offshore energy news, part of the Navingo network.

Topics
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
Network
  • Offshore Energy
  • Offshore Wind
  • NavalToday
  • Dredging Today
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Home›Shipbuilding›Rolls-Royce to Supply Design and Integrated Systems Package to COSCO
Shipbuilding

October 16, 2013 · about 13 years ago

Rolls-Royce to Supply Design and Integrated Systems Package to COSCO

Rolls-Royce has won an order to provide an integrated design and equipment package for two offshore supply vessels to be built at COSCO (Guangdong) Shipyard Co., Ltd in China for the Singapore based Chellsea Group, an ambitious and quality conscious player in the offshore oilfield services industry.

2 minutes read
  • LinkedIn
  • X
  • Email

Rolls-Royce has won an order to provide an integrated design and equipment package for two offshore supply vessels to be built at COSCO (Guangdong) Shipyard Co., Ltd in China for the Singapore based Chellsea Group, an ambitious and quality conscious player in the offshore oilfield services industry.

The two Rolls-Royce UT 771 WP platform supply vessels will be the first vessels in Asia featuring the striking wave piercing bow designed to pierce through the waves in rough seas, making it possible to keep a more constant speed, reduce fuel consumption and increase on board safety.

The vessels will be added to the fleet of two UT-vessels operated by Chellsea today.

Anders Almestad, Rolls-Royce, President – Offshore , said: “ This new design has been developed in cooperation between Rolls-Royce, the ship owner and the yard. Their viewpoint has been vital to our design team in this project. We are very pleased that COSCO have confidence in us and introduced us to another new customer. We look forward to building a fruitful relationship with Chellsea going forward.”

The delivery from Rolls-Royce will comprise ship design and an extensive integrated systems package including MTU-engines, propulsion system, power electrical system, bulk handling system, deck machinery, automation and control system as well as dynamic positioning system that use satellite technology to automatically maintain the vessels’ position without anchoring.

The two vessels are scheduled for delivery in 2015. The contract includes an option for additional four vessels.

There are 22 Rolls-Royce UT-vessels under construction in China at present. Of these are four UT-vessels under construction at the COSCO Guangdong yard and four at the COSCO Zhoushan shipyard.

[mappress]

Rolls-Royce, October 16, 2013

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

ShipbuildingBusiness & Finance

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1TotalEnergies, Staatsolie and APA advancing $12.2B oil project ahead of 2027 drilling ops
  2. 2New gas discovery springs up from India’s frontier deepwater basin
  3. 3Legal showdown underway as Cotemar moves to freeze almost $60M in American Bureau of Shipping subsidiary’s assets
  4. 4Jan De Nul orders another newbuild trenching support vessel

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free