Offshore Energy
  • news
  • test
JobsNewsletter
Offshore Energy logo
Topics
  • News
  • Contracts & Tenders
  • Authorities & Government
  • Automation
  • Business & Finance
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›Business & Finance›InterMoor Wins Design, Fabrication, Installation and Hook-Up Contract (USA)
Business & Finance

October 23, 2013 · about 12 years ago

InterMoor Wins Design, Fabrication, Installation and Hook-Up Contract (USA)

InterMoor, an Acteon company, has won a contract for design, fabrication and installation of 12 suction pile anchors, pre-set installation of 12 chain / polyester / chain mooring lines and hook-up of the LLOG Delta House production semi-submersible (the Floating Production System “FPS”). The work wi

2 minutes read
  • LinkedIn
  • X
  • Email

InterMoor, an Acteon company, has won a contract for design, fabrication and installation of 12 suction pile anchors, pre-set installation of 12 chain / polyester / chain mooring lines and hook-up of the LLOG Delta House production semi-submersible (the Floating Production System “FPS”).

The work will be conducted in the Mississippi Canyon 254 block of the U.S. Gulf of Mexico.

The project will involve suction pile design, fabrication and installation, followed by pre-set mooring installation and pre-set mooring hook-up of the FPS. The 12 piles will be 85 ft. long and 16 ft. in diameter weighing approximately 150 metric tonnes each. They are designed to be used as permanent anchors for the project. Installation activities are planned for mid-2014. Delta House will be moored in 4,500 ft. of water and is LLOG’s second Exmar-designed Opti deep-draft, semi-submersible production system in the region.

Tom Fulton, InterMoor’s president, states, “Our approach to the award process involved paying close attention to the client’s needs – which included comprehensive engineering, design, fabrication and installation procedures and plans – and preparing a detailed proposal that broke out each phase of the work scope. This project will add to InterMoor’s already strong track record for permanent moorings which includes some of the largest deepwater mooring projects around the world, including Kikeh, Shell Auger, ATP Mirage and the Williams Gulfstar FPS.”

Fabrication of the 12 suction piles for the LLOG Delta House will take place at InterMoor’s 30,000 sq. ft. Morgan City, LA, facility. The ISO 9001:2008 and ISO 14001 certified site includes two fabrication buildings complete with engineering and design capabilities.

[mappress]

Press Release, October 23, 2013

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Business & FinanceEquipmentOperations & MaintenanceProject & Tenders

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1ADES jack-up rig pair lines up drilling jobs in Nigerian and UK waters
  2. 2Odfjell Drilling’s rig remaining with Norwegian oil & gas operator for another year
  3. 3Karoon boosts Brazilian field’s oil output with all wells now online
  4. 4TotalEnergies offloading Mexican shallow water block to Grupo Carso

Related articles

FPSO Cidade de Itajaí; Source: Altera Infrastructure
Business & Finance

Karoon boosts Brazilian field’s oil output with all wells now online

24 days ago

Illustration; Source: TotalEnergies
Business & Finance

TotalEnergies offloading Mexican shallow water block to Grupo Carso

24 days ago

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

FPSO Cidade de Itajaí; Source: Altera Infrastructure
Business & Finance

Karoon boosts Brazilian field’s oil output with all wells now online

24 days ago
Illustration; Source: TotalEnergies
Business & Finance

TotalEnergies offloading Mexican shallow water block to Grupo Carso

24 days ago