Offshore Energy
  • news
  • test
JobsNewsletter
Offshore Energy logo
Topics
  • News
  • Contracts & Tenders
  • Authorities & Government
  • Automation
  • Business & Finance
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›Authorities & Government›Deepwater Wind Modifies Block Island Wind Farm Proposal
Authorities & Government

November 27, 2013 · about 12 years ago

Deepwater Wind Modifies Block Island Wind Farm Proposal

U.S. Army Corps of Engineers, New England District, have announced that the developer of the proposed Block Island Wind Farm is modifying the proposed plans in seeking a permit to construct the offshore wind farm with accompanying transmission system. The company’s plans involve building a 30MW offs

1 minutes read
  • LinkedIn
  • X
  • Email

U.S. Army Corps of Engineers, New England District, have announced that the developer of the proposed Block Island Wind Farm is modifying the proposed plans in seeking a permit to construct the offshore wind farm with accompanying transmission system.

The company’s plans involve building a 30MW offshore wind farm and power transmission infrastructure off the southeast coast of Block Island, Rhode Island.

U.S. Army Corps of Engineers is now seeking public comments on a proposed project modification. The change consists of an alternative shore landing and buried terrestrial route for the Block Island Transmission System cable on the Rhode Island mainland, referred to as the Scarborough Beach Alternative. The previously proposed Narragansett Town Beach landing alternative has been eliminated from the proposed plan, along with the long-distance horizontal directional drill (HDD) landing construction option for the wind farm’s export cable and transmission system cable on Block Island.

“The Corps is seeking public comments limited to the scope of the activity associated with this modification. All previous comments received regarding the offshore wind farm with its associated submarine interconnecting and transmission cables are part of the Corps’ administrative record and will be evaluated along with any additional comments received in response to this project modification notice,” The Corps said.

[mappress]

Press release, November 27, 2013; Image: Deepwater Wind

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Authorities & GovernmentStorage

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1ADES jack-up rig pair lines up drilling jobs in Nigerian and UK waters
  2. 2Odfjell Drilling’s rig remaining with Norwegian oil & gas operator for another year
  3. 3Karoon boosts Brazilian field’s oil output with all wells now online
  4. 4TotalEnergies offloading Mexican shallow water block to Grupo Carso

Related articles

A jack-up rig
Authorities & Government

Borr Drilling’s Mexican JV closer to being five rigs richer as sale clears regulatory hurdle

11 days ago

Underground drilling marks start of offshore section works for second Malta-Italy link
Authorities & Government

Underground drilling marks start of offshore section works for second Malta-Italy link

12 days ago

Singapore and Indonesia target 3.4 GW of cross-border electricity interconnections by 2035
Authorities & Government

Singapore and Indonesia target 3.4 GW of cross-border electricity interconnections by 2035

13 days ago

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

A jack-up rig
Authorities & Government

Borr Drilling’s Mexican JV closer to being five rigs richer as sale clears regulatory hurdle

11 days ago
Underground drilling marks start of offshore section works for second Malta-Italy link
Authorities & Government

Underground drilling marks start of offshore section works for second Malta-Italy link

12 days ago
Singapore and Indonesia target 3.4 GW of cross-border electricity interconnections by 2035
Authorities & Government

Singapore and Indonesia target 3.4 GW of cross-border electricity interconnections by 2035

13 days ago