Offshore Energy
  • news
  • test
JobsNewsletter
Offshore Energy logo

© 2026 Navingo. All rights reserved.

Home›Operations & Maintenance›Teesside OWF Temporarily Shut Down (UK)
Operations & Maintenance

January 15, 2014 · about 12 years ago

Teesside OWF Temporarily Shut Down (UK)

Teesside offshore wind farm, located off the north-east coast of England, has been temporarily shut down to allow technical investigation on turbines. Engineers will undertake investigations on housings for equipment located inside the turbine towers, EDF Energy Renewables, the developer, informed.

1 minutes read
  • LinkedIn
  • X
  • Email

Teesside offshore wind farm, located off the north-east coast of England, has been temporarily shut down to allow technical investigation on turbines.

Engineers will undertake investigations on housings for equipment located inside the turbine towers, EDF Energy Renewables, the developer, informed.

“These investigations will be easier and safer carried out under shut down conditions,” the Gazette Live quotes Teesside Offshore Wind Plant Manager Mark Halliday as saying.

“We are working with the turbine manufacturer, Siemens, to investigate in full and hope to return the wind farm to service as soon as is safely possible.”

[mappress]

Offshore WIND Staff, January 15, 2014; Image: mhwpr

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Operations & Maintenance

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1ADES jack-up rig pair lines up drilling jobs in Nigerian and UK waters
  2. 2Odfjell Drilling’s rig remaining with Norwegian oil & gas operator for another year
  3. 3Karoon boosts Brazilian field’s oil output with all wells now online
  4. 4TotalEnergies offloading Mexican shallow water block to Grupo Carso

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free