Offshore Energy
  • news
  • test
JobsNewsletter
Offshore Energy logo
Topics
  • News
  • Contracts & Tenders
  • Authorities & Government
  • Automation
  • Business & Finance
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›Research & Development›Testing of R115 Wave Energy System Enters Second Phase
Research & Development

February 5, 2014 · about 12 years ago

Testing of R115 Wave Energy System Enters Second Phase

Enel Green Power (EGP) and 40SouthEnergy have begun the second phase of testing the R115 wave energy system at sea. The machine, which has been developed by 40SouthEnergy, will leave from the port of Livorno once again, this time completely assembled, to be tested offshore at Punta Righini before re

2 minutes read
  • LinkedIn
  • X
  • Email

Enel Green Power (EGP) and 40SouthEnergy have begun the second phase of testing the R115 wave energy system at sea.

The machine, which has been developed by 40SouthEnergy, will leave from the port of Livorno once again, this time completely assembled, to be tested offshore at Punta Righini before reaching its final location of Elba island. R115 generators, which have a capacity of 150 kilowatts, will be able to produce 220 gigawatt-hours of power per year, enough to meet the electricity demand of more than 80 households.

With wave power generation, EGP is further expanding its technological portfolio, which already includes hydropower, geothermal, solar power, wind power and biomass.

The first phase of testing confirmed both the machine’s expected performance and the simplicity of its installation, while the second phase will aim to optimise the use of materials and operations.

EGP CEO Francesco Starace said: “We believe in this technology for several reasons: it’s safe, as maintenance can be carried out on the surface, it’s safe for navigation due to a scuttling system that avoids collisions with fishing ships and it is made of perfectly ordinary materials.”

“We think it can be developed in Latin America, and we are thinking about developing a machine that can produce up to two megawatts,” Starace concluded.

EGP and 40South Energy have further consolidated their partnership in order to develop a new 2MW prototype, which will operate in the same way as the device currently being tested, and have the same essential characteristics.

[mappress]

Press release, February 5, 2014; Image: EGP

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Research & DevelopmentTechnology

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1ADES jack-up rig pair lines up drilling jobs in Nigerian and UK waters
  2. 2Odfjell Drilling’s rig remaining with Norwegian oil & gas operator for another year
  3. 3Karoon boosts Brazilian field’s oil output with all wells now online
  4. 4TotalEnergies offloading Mexican shallow water block to Grupo Carso

Related articles

Illustration; Source: Halliburton
Automation

Eni, Halliburton cheer Asia-Pacific’s first integrated closed-loop rig automation milestone

19 days ago

Kongsberg Maritime to acquire Sweden’s Berg Propulsion
Business & Finance

Kongsberg Maritime to acquire Sweden’s Berg Propulsion

21 days ago

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Illustration; Source: Halliburton
Automation

Eni, Halliburton cheer Asia-Pacific’s first integrated closed-loop rig automation milestone

19 days ago
Kongsberg Maritime to acquire Sweden’s Berg Propulsion
Business & Finance

Kongsberg Maritime to acquire Sweden’s Berg Propulsion

21 days ago