Offshore Energy
  • news
  • test
JobsNewsletter
Offshore Energy logo
Topics
  • News
  • Contracts & Tenders
  • Authorities & Government
  • Automation
  • Business & Finance
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›Research & Development›French Floating Wind Project Lags Behind
Research & Development

February 6, 2014 · about 12 years ago

French Floating Wind Project Lags Behind

After being announced as imminent on several occasions in 2013, the construction of the floating wind turbine prototype Winflo has still not commenced. For this reason, DCNS and Nass & Wind have decided to reconsider the project. Initially, the developers were planning to deploy a small-scale demons

2 minutes read
  • LinkedIn
  • X
  • Email

After being announced as imminent on several occasions in 2013, the construction of the floating wind turbine prototype Winflo has still not commenced. For this reason, DCNS and Nass & Wind have decided to reconsider the project.

Initially, the developers were planning to deploy a small-scale demonstrator with a 1MW turbine, while the final device planned by manufacturers would have a capacity of about 5 MW.

After testing the prototype on the SEM-REV site off the coast of Croisic, a full-scale pilot wind farm (four to six machines) would have been installed by 2016 off the island of Groix.

The aim was to start with the construction once all technical validations and assurance of an adequate energy production had been acquired.

Since some projects have already emerged, such as WindFloat off Portugal in 2011, and others are now emerging, like the demonstrator Alstom wants to install in 2015 off Cornwall, it turns out that the area of floating wind technology is picking up speed.

Compared to this, the Winflo project has long been overdue, forcing DCNS and Nass&Wind to rethink their project in order to be able to keep up.

Under these circumstances, it is questioned whether the Winflo developers should kick start the project with a turbine ranging from 5 to 7 MW. If this would be the case, sea trials cannot be carried out off the coast of Croisic due to the excessive size of the turbine.

[mappress]

Offshore WIND Staff, February 6, 2014; Image: DCNS

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Research & DevelopmentTechnology

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1ADES jack-up rig pair lines up drilling jobs in Nigerian and UK waters
  2. 2Odfjell Drilling’s rig remaining with Norwegian oil & gas operator for another year
  3. 3Karoon boosts Brazilian field’s oil output with all wells now online
  4. 4TotalEnergies offloading Mexican shallow water block to Grupo Carso

Related articles

Illustration; Source: Halliburton
Automation

Eni, Halliburton cheer Asia-Pacific’s first integrated closed-loop rig automation milestone

20 days ago

Kongsberg Maritime to acquire Sweden’s Berg Propulsion
Business & Finance

Kongsberg Maritime to acquire Sweden’s Berg Propulsion

22 days ago

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Illustration; Source: Halliburton
Automation

Eni, Halliburton cheer Asia-Pacific’s first integrated closed-loop rig automation milestone

20 days ago
Kongsberg Maritime to acquire Sweden’s Berg Propulsion
Business & Finance

Kongsberg Maritime to acquire Sweden’s Berg Propulsion

22 days ago