Offshore Energy
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
  • More news
JobsNewsletter
Offshore Energy logo

Your trusted source for global offshore energy news, part of the Navingo network.

Topics
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
Network
  • Offshore Energy
  • Offshore Wind
  • NavalToday
  • Dredging Today
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Home›Shipbuilding›DSME Lays Keel for Ichthys FPSO (South Korea)
Shipbuilding

February 19, 2014 · about 12 years ago

DSME Lays Keel for Ichthys FPSO (South Korea)

Daewoo Shipbuilding & Marine Engineering (DSME) shipyard in Okpo, South Korea, recently held a keel-laying ceremony for Ichthys LNG Floating Production, Storage and Offloading (FPSO) facility. Speaking at the event, Managing Director Ichthys Project Louis Bon said the keel laying was significant as

2 minutes read
  • LinkedIn
  • X
  • Email

Daewoo Shipbuilding & Marine Engineering (DSME) shipyard in Okpo, South Korea, recently held a keel-laying ceremony for Ichthys LNG Floating Production, Storage and Offloading (FPSO) facility.

Speaking at the event, Managing Director Ichthys Project Louis Bon said the keel laying was significant as it is the structure around which the FPSO would take form.

“ In a year that will see many major milestones for the Ichthys LNG Project, this is a very big moment ,” he said. “ The FPSO is the facility that will be used for condensate dewatering, stabilisation, storage and export – so its importance cannot be overstated. With only a few years until first production, all of our major offshore facilities are taking shape. ”

Following tradition and placing a newly minted Australian gold coin under the keel block for good luck, Mr Bon said the milestone was the major next step in bringing together the fabricated blocks of the FPSO.

In traditional shipbuilding, keel laying was celebrated because it signified that work was starting on a vessel. In the case of Ichthys, modular construction means that most pieces of the FPSO will have been incorporated in blocks before keel laying, for faster sequencing.

Once complete, the facility will be towed 5,600 km to the Ichthys Field in the Browse Basin, offshore Western Australia, where it will be permanently moored to the seabed for the life of the Project.

The 336m by 59m FPSO is designed to hold more than one million barrels of condensate, which will be offloaded periodically to crude oil tankers and shipped directly to market.

Work is underway for all major Ichthys LNG Project offshore facilities, including the Central Processing Facility, subsea structures and the Gas Export Pipeline.

[mappress]

DSME, February 19, 2014

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

ShipbuildingBusiness & Finance

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Ventura Offshore rig staying longer with Eni and Petronas’ Searah in Southeast Asia
  2. 2Last FSRU in seven-vessel conversion program boosts Karpowership’s LNG-to-power value chain
  3. 3SLB’s grand slam with Aramco puts over 450 oil & gas wells on its plate
  4. 4Chevron and Egypt discuss next steps to speed up Mediterranean gas project

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free