Offshore Energy
  • news
  • test
JobsNewsletter
Offshore Energy logo
Topics
  • News
  • Contracts & Tenders
  • Authorities & Government
  • Automation
  • Business & Finance
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›Business & Finance›UK: Beach Protection Program Underway in Norfolk
Business & Finance

February 24, 2014 · about 12 years ago

UK: Beach Protection Program Underway in Norfolk

The development works, undertaken annually to maintain the shingle embankment which protects people and property from tidal flooding between Snettisham and Heacham, started today and will be completed within two weeks. The embankment is a type of ‘soft’ sea defence, designed to be eroded over the au

2 minutes read
  • LinkedIn
  • X
  • Email

The development works, undertaken annually to maintain the shingle embankment which protects people and property from tidal flooding between Snettisham and Heacham, started today and will be completed within two weeks.

The embankment is a type of ‘soft’ sea defence, designed to be eroded over the autumn and winter, with repairs made early each year to maintain the standard of protection.

The East Coast storm surge on 5 December last year caused considerably more damage than usual, reducing the embankment by 75% in some parts and creating two significant breaches. Emergency repairs have already been completed to these areas, so the regular maintenance can now be done.

Ryan Ely, Environment Agency technical specialist , said: “ We generally use around 7,000 cubic metres of sand and shingle to reinforce the defences, with this stage of the work bringing the defences back to the right standard.”

The Environment Agency monitors beach levels throughout the year and assesses how much material will need to be taken from Snettisham Scalp and where it will need to be placed.

The project is currently carried out in partnership with Natural England and the RSPB due to the environmental importance of this coastline. The Environment Agency carries out ecological monitoring to ensure there is no long term detrimental effect on the ecology of the area.

The work is being carried out before the start of the bird breeding season and will be completed before the start of the main tourist season. Including the emergency works, the total repairs will cost around £150,000 this year.

[mappress]

Press Release, February 24, 2014

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Business & FinanceEquipmentTechnology

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1ADES jack-up rig pair lines up drilling jobs in Nigerian and UK waters
  2. 2Odfjell Drilling’s rig remaining with Norwegian oil & gas operator for another year
  3. 3Karoon boosts Brazilian field’s oil output with all wells now online
  4. 4TotalEnergies offloading Mexican shallow water block to Grupo Carso

Related articles

FPSO Cidade de Itajaí; Source: Altera Infrastructure
Business & Finance

Karoon boosts Brazilian field’s oil output with all wells now online

18 days ago

Illustration; Source: TotalEnergies
Business & Finance

TotalEnergies offloading Mexican shallow water block to Grupo Carso

18 days ago

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

FPSO Cidade de Itajaí; Source: Altera Infrastructure
Business & Finance

Karoon boosts Brazilian field’s oil output with all wells now online

18 days ago
Illustration; Source: TotalEnergies
Business & Finance

TotalEnergies offloading Mexican shallow water block to Grupo Carso

18 days ago