Offshore Energy
  • news
  • test
JobsNewsletter
Offshore Energy logo
Topics
  • News
  • Contracts & Tenders
  • Authorities & Government
  • Automation
  • Business & Finance
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›Business & Finance›Corps: DEA, DSOC Available for Barnegat Inlet Erosion Control Project (USA)
Business & Finance

February 25, 2014 · about 12 years ago

Corps: DEA, DSOC Available for Barnegat Inlet Erosion Control Project (USA)

The U.S. Army Corps of Engineers, New York District, announced the availability of the Draft Environmental Assessment (DEA) and Draft Statement of Conformity (DSOC) for the Elberon to Loch Arbour reach of the Sandy Hook to Barnegat Inlet Beach Erosion Control Project, Section I – Sea Bright to Ocean

2 minutes read
  • LinkedIn
  • X
  • Email

The U.S. Army Corps of Engineers, New York District, announced the availability of the Draft Environmental Assessment (DEA) and Draft Statement of Conformity (DSOC) for the Elberon to Loch Arbour reach of the Sandy Hook to Barnegat Inlet Beach Erosion Control Project, Section I – Sea Bright to Ocean Township and the opening of the window for the public to submit written comments regarding those documents.

With the passage of the Disaster Relief Appropriations Act of 2013, the Army Corps has been given the authority and funding to complete ongoing coastal storm damage risk management projects and studies in the Northeast, including the Elberon to Loch Arbour project, which was previously authorized as part of the larger Sandy Hook to Barnegat Inlet project but was not constructed.

As part of the planning and implementation process for the authorized Elberon to Loch Arbour project, the New York District has updated prior engineering and design efforts, physical surveys, and environmental compliance in putting together the recently completed Draft Hurricane Sandy Limited Re-evaluation Report (HSLRR).

The Sandy Hook to Barnegat Inlet project is a partnership between the Army Corps and the New Jersey Department of Environmental Protection.

The proposed Elberon to Loch Arbour project calls for the placement of roughly 4.5 million cubic yards of sand to create a 100-foot-wide beach berm 12 feet above mean low water. The project also calls for the modification of six groins to allow for the movement of sediment and modifications to 16 outfalls to ensure their continued operation after the beach berm is created and to prevent their operation from negatively impacting the newly constructed beach berm.

Pending the Environmental Assessment, required reviews of the Elberon to Loch Arbour Reach Draft Hurricane Sandy Limited Re-evaluation Report and the signing of a Project Partnership Agreement with the DEP, the Corps expects to award the construction contract for the Elberon to Loch Arbour project in summer or fall of 2014.

[mappress]

Press Release, February 25, 2014

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Business & FinanceEquipmentTechnology

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1ADES jack-up rig pair lines up drilling jobs in Nigerian and UK waters
  2. 2Odfjell Drilling’s rig remaining with Norwegian oil & gas operator for another year
  3. 3Karoon boosts Brazilian field’s oil output with all wells now online
  4. 4TotalEnergies offloading Mexican shallow water block to Grupo Carso

Related articles

FPSO Cidade de Itajaí; Source: Altera Infrastructure
Business & Finance

Karoon boosts Brazilian field’s oil output with all wells now online

18 days ago

Illustration; Source: TotalEnergies
Business & Finance

TotalEnergies offloading Mexican shallow water block to Grupo Carso

18 days ago

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

FPSO Cidade de Itajaí; Source: Altera Infrastructure
Business & Finance

Karoon boosts Brazilian field’s oil output with all wells now online

18 days ago
Illustration; Source: TotalEnergies
Business & Finance

TotalEnergies offloading Mexican shallow water block to Grupo Carso

18 days ago