Offshore Energy
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
  • More news
JobsNewsletter
Offshore Energy logo

Your trusted source for global offshore energy news, part of the Navingo network.

Topics
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
Network
  • Offshore Energy
  • Offshore Wind
  • NavalToday
  • Dredging Today
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Home›Shipbuilding›HII Receives Contract Extension for Aircraft Carrier John F. Kennedy (USA)
Shipbuilding

March 5, 2014 · about 12 years ago

HII Receives Contract Extension for Aircraft Carrier John F. Kennedy (USA)

Huntington Ingalls Industries’ Newport News Shipbuilding (NNS) division has received a $1.295 billion extension to a previously awarded construction preparation contract for the aircraft carrier John F. Kennedy (CVN 79). The contract extension enables NNS to complete an additional 343 structural uni

2 minutes read
  • LinkedIn
  • X
  • Email

Huntington Ingalls Industries’ Newport News Shipbuilding (NNS) division has received a $1.295 billion extension to a previously awarded construction preparation contract for the aircraft carrier John F. Kennedy (CVN 79).

The contract extension enables NNS to complete an additional 343 structural units and purchase the majority of the remaining material for the ship, including items such as valves, controllers, pumps and raw materials.

NNS has performed work on John F. Kennedy since Jan. 15, 2009, under a construction preparation contract that allows engineering, planning, material procurement and initial manufacturing to begin before the full construction contract is awarded.

“ This additional funding helps us maintain our positive momentum with savings initiatives and pre-construction in advance of the construction contract that is expected later this year ,” said Mike Shawcross, Newport News’ vice president, CVN 79 construction. “ In addition to increasing the number of structural units under contract, it allows the CVN 79 procurement team to place purchase orders for most of the remaining material for the ship, which helps us meet our efficiency objectives through economic order quantities and consolidated buys. It also ensures that lessons learned, best practices and production efficiencies from building Gerald R. Ford can continue to be implemented at the most optimal time, providing a smooth transition to the second ship of the Ford class. ”

Ford-class enhancements incorporated into the design include flight deck changes, improved weapons handling systems and a redesigned island, all resulting in increased aircraft sortie-generation rates.

Kennedy will also feature new nuclear power plants, increased electrical power-generation capacity, allowance for future technologies, and reduced workload for sailors, translating to a smaller crew size and reduced operating costs for the Navy.

[mappress]

HII, March 5, 2014

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

ShipbuildingBusiness & Finance

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Ventura Offshore rig staying longer with Eni and Petronas’ Searah in Southeast Asia
  2. 2Last FSRU in seven-vessel conversion program boosts Karpowership’s LNG-to-power value chain
  3. 3SLB’s grand slam with Aramco puts over 450 oil & gas wells on its plate
  4. 4Chevron and Egypt discuss next steps to speed up Mediterranean gas project

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free