Offshore Energy
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
  • More news
JobsNewsletter
Offshore Energy logo

Your trusted source for global offshore energy news, part of the Navingo network.

Topics
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
Network
  • Offshore Energy
  • Offshore Wind
  • NavalToday
  • Dredging Today
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Home›Wind Farms›Thornton Bank OWF’s Power Production Exceeds Expectations
Wind Farms

March 7, 2014 · about 12 years ago

Thornton Bank OWF’s Power Production Exceeds Expectations

The C-Power wind farm, also known as the Thornton Bank offshore wind farm, was running at full speed in December, January and February and produced 29% more energy than expected. Exceptionally favourable wind conditions and high technical reliability of the wind farm led to this power production rec

1 minutes read
  • LinkedIn
  • X
  • Email

The C-Power wind farm, also known as the Thornton Bank offshore wind farm, was running at full speed in December, January and February and produced 29% more energy than expected.

Exceptionally favourable wind conditions and high technical reliability of the wind farm led to this power production record.

The 54 wind turbines, which are positioned 30 kilometres out to sea, already produced 17% more electricity in December. In January and February however, all records were broken with a production of 290 GWh or 35% more then expected. In these three months, the wind farm produced the equivalent of the annual energy consumption of 120.000 families.

This production is 2,6 times higher than the production in months with extremely poor wind conditions such as July, August and September 2013. This is explained by a high technical availability, high average wind speeds and the fact that during those two winter months, wind speeds only fell below 20 km/h on 8 days.

As from December till February, there were 13 stormy days with average wind speeds exceeding 80 km/h. These powerful turbines are only discontinued for safety reasons when the wind reaches speeds of 108 km/h or more for 10 minutes. Such high speeds were not reached, so all wind turbines always continued to run at full speed.

[mappress]

Press release, March 7, 2014; Image: © C-Power nv. photographer Tom D’Haenens

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Wind FarmsEnvironment

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1TotalEnergies, Staatsolie and APA advancing $12.2B oil project ahead of 2027 drilling ops
  2. 2New gas discovery springs up from India’s frontier deepwater basin
  3. 3Legal showdown underway as Cotemar moves to freeze almost $60M in American Bureau of Shipping subsidiary’s assets
  4. 4Jan De Nul orders another newbuild trenching support vessel

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free