Offshore Energy
  • news
  • test
JobsNewsletter
Offshore Energy logo
Topics
  • News
  • Contracts & Tenders
  • Authorities & Government
  • Automation
  • Business & Finance
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›Business & Finance›Trelleborg completes its first floatover project in China
Business & Finance

March 7, 2014 · about 12 years ago

Trelleborg completes its first floatover project in China

Trelleborg’s engineered products operation has completed its first oil and gas floatover project in China, supplying a range of its floatover hardware for the BoZhong (BZ) 35-2 COEEC offshore platform in Tianjin.

2 minutes read
  • LinkedIn
  • X
  • Email

Trelleborg’s engineered products operation has completed its first oil and gas floatover project in China, supplying a range of its floatover hardware for the BoZhong (BZ) 35-2 COOEC offshore platform in Tianjin.

Designed and fabricated by China Offshore Oil Engineering Company (COOEC), the platform’s specification called for hardware that guaranteed reliability and safety, and required a supplier with the highest standards and a strong track record. Leg mating unit (LMU) components designed by Trelleborg were produced strictly in accordance with client design specifications and international standards.

Yang Xiaolong , Design Engineer at COOEC, said: “The industry’s demand for optimum performance and consistently reliable products, which deliver in the most challenging environments, is growing. Cheap and quick solutions just aren’t a consideration where performance may be jeopardised. And this project was no different. Trelleborg was able to meet the strict specifications to supply quality solutions, which had been stringently tested at their in-house facility. The company’s expert product knowledge and understanding of its applications meant that it was entirely suited for the project. Importantly, it meant that we were provided with assurance and performance throughout.”

JP Chia , Engineering Manager within the engineered products operation of Trelleborg Offshore & Construction, said: “Floatover operations carry with them huge risks and implications; should failure occur during the mating process, the project could be delayed and costs start to mount. It is because of this that Trelleborg works so hard to design and manufacture products which will meet stringent testing requirements, as failure just isn’t an option in this environment. We were thrilled to be chosen as supplier of choice for the mating hardware on this project, especially as it is Trelleborg’s first completed project of this kind in China.”

Vincent Tan , Sales and Marketing Manager within the engineered products operation of Trelleborg Offshore & Construction, also commented: “The industry is beginning to switch its focus towards quality and reliability, as opposed to saving costs upfront with cheap, quick-fix solutions. As a result, Trelleborg was able to demonstrate its dedication to high performance solutions, which were ideal for the BZ 35-2 project. We hope that more opportunities arise in China as a result.”

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Business & FinanceEquipmentProject & Tenders

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1ADES jack-up rig pair lines up drilling jobs in Nigerian and UK waters
  2. 2Odfjell Drilling’s rig remaining with Norwegian oil & gas operator for another year
  3. 3Karoon boosts Brazilian field’s oil output with all wells now online
  4. 4TotalEnergies offloading Mexican shallow water block to Grupo Carso

Related articles

Deepsea Nordkapp rig; Source: Odfjell Drilling
Business & Finance

Odfjell Drilling’s rig remaining with Norwegian oil & gas operator for another year

25 days ago

FPSO Cidade de Itajaí; Source: Altera Infrastructure
Business & Finance

Karoon boosts Brazilian field’s oil output with all wells now online

26 days ago

Illustration; Source: TotalEnergies
Business & Finance

TotalEnergies offloading Mexican shallow water block to Grupo Carso

26 days ago

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Deepsea Nordkapp rig; Source: Odfjell Drilling
Business & Finance

Odfjell Drilling’s rig remaining with Norwegian oil & gas operator for another year

25 days ago
FPSO Cidade de Itajaí; Source: Altera Infrastructure
Business & Finance

Karoon boosts Brazilian field’s oil output with all wells now online

26 days ago
Illustration; Source: TotalEnergies
Business & Finance

TotalEnergies offloading Mexican shallow water block to Grupo Carso

26 days ago