Offshore Energy
  • news
  • test
JobsNewsletter
Offshore Energy logo

© 2026 Navingo. All rights reserved.

Home›Business & Finance›Vallourec to Supply Pipes for Total’s ML-South Project in Brunei
Business & Finance

March 7, 2014 · about 12 years ago

Vallourec to Supply Pipes for Total’s ML-South Project in Brunei

Vallourec has been awarded a $100 million contract for the supply of premium pipes with VAM® 21 connections for the offshore ML-South Project, operated by Total’s affiliate Total E&P Borneo in Brunei. After a successful exploration campaign started in 2007, Total has a drilling program starting with

2 minutes read
  • LinkedIn
  • X
  • Email

Vallourec has been awarded a $100 million contract for the supply of premium pipes with VAM® 21 connections for the offshore ML-South Project, operated by Total’s affiliate Total E&P Borneo in Brunei.

After a successful exploration campaign started in 2007, Total has a drilling program starting with 6 development wells from 2015.

ML-South is located in Block B offshore Brunei and is an extension of the producing Maharaja Lela Jamalulalam field with water depth of approximately 65 meters, and is expected to hold important gas and condensate reserves.

Most challenging operating conditions

The development wells will be producing at depth greater than 5,000m, in a highly corrosive environment and sustaining High Pressure/ High Temperature (HP/HT). These conditions position the project at a new field development frontier. It highlights Total’s expertise in operating in very complex environments and consolidates Vallourec’s leadership position in supplying premium OCTG (Oil Country Tubular Goods) solutions to the oil & gas industry.

Didier Hornet, Managing Director of Vallourec’s Oil & Gas Activities , said: “We are honored to have been selected by Total for this complex offshore project. This contract recognizes Vallourec’s ability to provide the most advanced premium tubular solutions and services in the most challenging environments. We will work alongside Total to develop the local contribution to this project.”

Vallourec will equip the wells with premium pipes the majority of which in high alloyed, corrosion-resistant grades, threaded with its latest premium connection VAM® 21. Casing and tubing will be manufactured in Vallourec’s European & Indonesian plants. The pipes are expected to be delivered to Total E&P Borneo for drilling operations scheduled to start in the second half of 2015.

Press Release, March 07, 2014; Image: Total

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Business & FinanceOperations & MaintenanceProject & Tenders

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1ADES jack-up rig pair lines up drilling jobs in Nigerian and UK waters
  2. 2Odfjell Drilling’s rig remaining with Norwegian oil & gas operator for another year
  3. 3Karoon boosts Brazilian field’s oil output with all wells now online
  4. 4TotalEnergies offloading Mexican shallow water block to Grupo Carso

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free