Offshore Energy
  • news
  • test
JobsNewsletter
Offshore Energy logo
Topics
  • News
  • Contracts & Tenders
  • Authorities & Government
  • Automation
  • Business & Finance
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›Technology›Gamesa Certifies Its 5MW Wind Turbine
Technology

March 10, 2014 · about 12 years ago

Gamesa Certifies Its 5MW Wind Turbine

Gamesa has secured type certification for its first offshore wind turbine, the G128-5.0 MW Offshore, from DNV-GL, an accredited independent body. This milestone completes the process of certifying the company’s first offshore product – in less than seven months – and constitutes an endorsement for t

1 minutes read
  • LinkedIn
  • X
  • Email

Gamesa has secured type certification for its first offshore wind turbine, the G128-5.0 MW Offshore, from DNV-GL, an accredited independent body.

This milestone completes the process of certifying the company’s first offshore product – in less than seven months – and constitutes an endorsement for the platform’s technology that in turn bolsters the marketing and industrialisation processes.

The G128-5.0 MW wind turbine prototype, the first offshore model in the 5.0 MW platform, has a rotor diameter of 128m and a total height of 154m. The turbine is notably lightweight, which reduces the cost of related wind farm civil engineering work. The G128-5.0 MW Offshore is capable of generating enough power to supply 5,000 households a year. Since it began to generate electricity in the summer of 2013, the prototype has injected more than 6,000 MWh into the grid.

These characteristics, which make the platform more robust and reliable, facilitated an availability reading in January of 97%, no easy feat for a prototype still at the validation stage. In November 2013, the prototype beat another record, producing the most electricity ever generated by a single turbine in Spain in one day: 118.05 MWh.

Press release, March 10, 2014; Image: gamesa

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Technology

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1ADES jack-up rig pair lines up drilling jobs in Nigerian and UK waters
  2. 2Odfjell Drilling’s rig remaining with Norwegian oil & gas operator for another year
  3. 3Karoon boosts Brazilian field’s oil output with all wells now online
  4. 4TotalEnergies offloading Mexican shallow water block to Grupo Carso

Related articles

Visual SeaKite for FPSO GranMorgu; Source: SBM Offshore
Business & Finance

Wind-assisted towing on the cards for SBM Offshore’s Suriname-bound FPSO

21 days ago

Illustration; Source: Halliburton
Automation

Eni, Halliburton cheer Asia-Pacific’s first integrated closed-loop rig automation milestone

21 days ago

Kongsberg Maritime to acquire Sweden’s Berg Propulsion
Business & Finance

Kongsberg Maritime to acquire Sweden’s Berg Propulsion

23 days ago

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Visual SeaKite for FPSO GranMorgu; Source: SBM Offshore
Business & Finance

Wind-assisted towing on the cards for SBM Offshore’s Suriname-bound FPSO

21 days ago
Illustration; Source: Halliburton
Automation

Eni, Halliburton cheer Asia-Pacific’s first integrated closed-loop rig automation milestone

21 days ago
Kongsberg Maritime to acquire Sweden’s Berg Propulsion
Business & Finance

Kongsberg Maritime to acquire Sweden’s Berg Propulsion

23 days ago