Offshore Energy
  • news
  • test
JobsNewsletter
Offshore Energy logo
Topics
  • News
  • Contracts & Tenders
  • Authorities & Government
  • Automation
  • Business & Finance
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›Business & Finance›DEA Available for Proposed Fire Island Inlet Stabilization Project (USA)
Business & Finance

March 18, 2014 · about 12 years ago

DEA Available for Proposed Fire Island Inlet Stabilization Project (USA)

The U.S. Army Corps of Engineers, New York District, announced the availability of the Draft Environmental Assessment (DEA) for the Fire Island Inlet to Moriches Inlet Stabilization Project and the opening of the window for the public to submit written comments regarding it. With the passage of the

1 minutes read
  • LinkedIn
  • X
  • Email

The U.S. Army Corps of Engineers, New York District, announced the availability of the Draft Environmental Assessment (DEA) for the Fire Island Inlet to Moriches Inlet Stabilization Project and the opening of the window for the public to submit written comments regarding it.

With the passage of the Disaster Relief Appropriations Act of 2013, the Army Corps has been given the authority and funding to complete ongoing coastal storm damage risk management projects and studies in the Northeast, including the Fire Island Inlet to Moriches Inlet project, which had been previously proposed for construction but was never constructed.

As part of the planning and implementation process for the Fire Island Inlet to Moriches Inlet project, the New York District has updated prior engineering and design efforts, physical surveys, and environmental compliance in putting together the recently completed Draft Hurricane Sandy Limited Re-evaluation Report (HSLRR).

The proposed Fire Island Inlet to Moriches Inlet project calls for the placement of roughly 7 million cubic yards of sand through three contracts to reinforce the existing dune and berm system along the island.

The selected design includes beachfill at Robert Moses State Park, the Fire Island Lighthouse Tract, all of the communities outside of Federal Tracts, and Smith Point County Park. Where feasible, dunes constructed as part of this project will be tied into existing natural dunes in Federal Tracts.

[mappress]

Press Release, March 18, 2014

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Business & FinanceEquipmentTechnology

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1ADES jack-up rig pair lines up drilling jobs in Nigerian and UK waters
  2. 2Odfjell Drilling’s rig remaining with Norwegian oil & gas operator for another year
  3. 3Karoon boosts Brazilian field’s oil output with all wells now online
  4. 4TotalEnergies offloading Mexican shallow water block to Grupo Carso

Related articles

FPSO Cidade de Itajaí; Source: Altera Infrastructure
Business & Finance

Karoon boosts Brazilian field’s oil output with all wells now online

19 days ago

Illustration; Source: TotalEnergies
Business & Finance

TotalEnergies offloading Mexican shallow water block to Grupo Carso

19 days ago

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

FPSO Cidade de Itajaí; Source: Altera Infrastructure
Business & Finance

Karoon boosts Brazilian field’s oil output with all wells now online

19 days ago
Illustration; Source: TotalEnergies
Business & Finance

TotalEnergies offloading Mexican shallow water block to Grupo Carso

19 days ago