Offshore Energy
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
  • More news
JobsNewsletter
Offshore Energy logo

Your trusted source for global offshore energy news, part of the Navingo network.

Topics
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
Network
  • Offshore Energy
  • Offshore Wind
  • NavalToday
  • Dredging Today
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Home›Shipbuilding›Christening Ceremony for U.S. Navy’s Newest LCS Scheduled for March 22
Shipbuilding

March 21, 2014 · about 12 years ago

Christening Ceremony for U.S. Navy’s Newest LCS Scheduled for March 22

The U.S. Navy will christen its newest littoral combat ship, the future USS Jackson (LCS 6) in a ceremony at the Austal USA Shipyard in Mobile, Ala., March 22, at 10 a.m. CDT. Secretary of the U.S Navy Ray Mabus will deliver the principal address at the ceremony, and Dr. Katherine Holmes Cochran wil

2 minutes read
  • LinkedIn
  • X
  • Email

The U.S. Navy will christen its newest littoral combat ship, the future USS Jackson (LCS 6) in a ceremony at the Austal USA Shipyard in Mobile, Ala., March 22, at 10 a.m. CDT.

Secretary of the U.S Navy Ray Mabus will deliver the principal address at the ceremony, and Dr. Katherine Holmes Cochran will serve as the ship’s sponsor. Cochran is the daughter of U.S. Senator Thad Cochran.

LCS 6 is the first U.S. Navy vessel christened in tribute to the capital city of Mississippi, and honors the state’s deep ties to the U.S. Navy and the shipbuilding industry.

Jackson is an innovative surface combatant designed to operate in littoral seas and shallow water to counter mines, submarines and fast surface craft threats in coastal regions.

The ship is capable of speeds in excess of 40 knots and can operate in water less than 20 feet deep. Jackson will address a critical capabilities gap in the littorals and conduct the Navy’s mission to enhance maritime security by deterring hostility, maintaining a forward presence, projecting power and maintaining sea control.

The ship launched Dec. 14, 2013, following construction at the Austal USA shipyard. These ships are the first vessels procured under the block buy contract awarded in 2010 and represent the true beginning of “serial production” for the class.

Jackson will continue to undergo outfitting and testing at Austal USA. The ship is expected to deliver to the U.S Navy in early 2015 following acceptance trials.

[mappress]

US Department of Defense, March 21, 2014; Image: Wikipedia

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

ShipbuildingBusiness & Finance

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Ventura Offshore rig staying longer with Eni and Petronas’ Searah in Southeast Asia
  2. 2Last FSRU in seven-vessel conversion program boosts Karpowership’s LNG-to-power value chain
  3. 3SLB’s grand slam with Aramco puts over 450 oil & gas wells on its plate
  4. 4Chevron and Egypt discuss next steps to speed up Mediterranean gas project

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free