Offshore Energy
  • news
  • test
JobsNewsletter
Offshore Energy logo
Topics
  • News
  • Contracts & Tenders
  • Authorities & Government
  • Automation
  • Business & Finance
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›Business & Finance›Corps Prepares Mystic River Dredging Project (USA)
Business & Finance

March 26, 2014 · about 12 years ago

Corps Prepares Mystic River Dredging Project (USA)

According to the U.S. Army Corps of Engineers, New England District, the Mystic River dredging project will cost between $5 mln and $10 mln. This cleanup program, located in Groton and Stonington, Connecticut, will last from four to six months. Approximately 250,000 cubic yards of material will be d

1 minutes read
  • LinkedIn
  • X
  • Email

According to the U.S. Army Corps of Engineers, New England District, the Mystic River dredging project will cost between $5 mln and $10 mln.

This cleanup program, located in Groton and Stonington, Connecticut, will last from four to six months.

Approximately 250,000 cubic yards of material will be dredged and placed at the New London Disposal Site (NLDS) in Long Island Sound or the Rhode Island Sound Disposal Site (RISDS) in Rhode Island Sound.

The solicitation is planned to be issued in June 2014.

More info

[mappress]

Source: fbo.gov, March 26, 2014

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Business & FinanceEquipmentTechnology

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1ADES jack-up rig pair lines up drilling jobs in Nigerian and UK waters
  2. 2Odfjell Drilling’s rig remaining with Norwegian oil & gas operator for another year
  3. 3Karoon boosts Brazilian field’s oil output with all wells now online
  4. 4TotalEnergies offloading Mexican shallow water block to Grupo Carso

Related articles

FPSO Cidade de Itajaí; Source: Altera Infrastructure
Business & Finance

Karoon boosts Brazilian field’s oil output with all wells now online

19 days ago

Illustration; Source: TotalEnergies
Business & Finance

TotalEnergies offloading Mexican shallow water block to Grupo Carso

19 days ago

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

FPSO Cidade de Itajaí; Source: Altera Infrastructure
Business & Finance

Karoon boosts Brazilian field’s oil output with all wells now online

19 days ago
Illustration; Source: TotalEnergies
Business & Finance

TotalEnergies offloading Mexican shallow water block to Grupo Carso

19 days ago