Offshore Energy
  • news
  • test
JobsNewsletter
Offshore Energy logo
Topics
  • News
  • Contracts & Tenders
  • Authorities & Government
  • Automation
  • Business & Finance
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›Business & Finance›First Subsea’s Pipeline Recovery Tool for Ichthys LNG Project
Business & Finance

March 26, 2014 · about 12 years ago

First Subsea’s Pipeline Recovery Tool for Ichthys LNG Project

First Subsea Ltd has been awarded a contract by Saipem Portugal Comercio Maritomo Sociedade Unipresso Lda to supply a 42” PRT (pipeline recovery tool) for the Gas Export Pipeline on the Ichthys LNG Project. The contingency tool is First Subsea’s largest modular PRT to date, and features a 400Te WLL;

2 minutes read
  • LinkedIn
  • X
  • Email

First Subsea Ltd has been awarded a contract by Saipem Portugal Comercio Maritomo Sociedade Unipresso Lda to supply a 42” PRT (pipeline recovery tool) for the Gas Export Pipeline on the Ichthys LNG Project.

The contingency tool is First Subsea’s largest modular PRT to date, and features a 400Te WLL; Hyperlast™ twin seal dewatering system, check valve, pig catcher, pig signaler and an ROV deployment arm.

The INPEX-operated Ichthys LNG Project includes an offshore central processing facility (CPF) and a Floating Production Storage and Offloading Facility (FPSO) located in the field with a number of satellite manifolds and subsea wells tied back to the CPF. Saipem is installing 889 kilometres of 42-inch-diameter subsea pipeline, in water depths of up to 275 metres, connecting the CPF to an onshore processing facility in Darwin.

The modular PRT system is suitable for pipe or tubular diameters of 42”, 48”, 54” and 60” using First Subsea’s patented Ballgrab® ball and taper grip technology for loads in excess of 1,200Te WLL. Guided by an ROV through deployment by the vessel crane, the PRT is inserted into the pipe and a secondary lock system activated through a hydraulic ROV hot stab. After the connection between the A&R wire to the PRT is established, the pipe and tool are then ready for recovery back to the surface.

The Ichthys LNG Project is a Joint Venture between INPEX group companies (Operator), major partner TOTAL and the Australian subsidiaries of Tokyo Gas, Osaka Gas, Chubu Electric Power and Toho Gas.

Press Release, March 26, 2014

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Business & FinanceEquipmentProject & Tenders

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1ADES jack-up rig pair lines up drilling jobs in Nigerian and UK waters
  2. 2Odfjell Drilling’s rig remaining with Norwegian oil & gas operator for another year
  3. 3Karoon boosts Brazilian field’s oil output with all wells now online
  4. 4TotalEnergies offloading Mexican shallow water block to Grupo Carso

Related articles

Deepsea Nordkapp rig; Source: Odfjell Drilling
Business & Finance

Odfjell Drilling’s rig remaining with Norwegian oil & gas operator for another year

26 days ago

FPSO Cidade de Itajaí; Source: Altera Infrastructure
Business & Finance

Karoon boosts Brazilian field’s oil output with all wells now online

26 days ago

Illustration; Source: TotalEnergies
Business & Finance

TotalEnergies offloading Mexican shallow water block to Grupo Carso

26 days ago

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Deepsea Nordkapp rig; Source: Odfjell Drilling
Business & Finance

Odfjell Drilling’s rig remaining with Norwegian oil & gas operator for another year

26 days ago
FPSO Cidade de Itajaí; Source: Altera Infrastructure
Business & Finance

Karoon boosts Brazilian field’s oil output with all wells now online

26 days ago
Illustration; Source: TotalEnergies
Business & Finance

TotalEnergies offloading Mexican shallow water block to Grupo Carso

26 days ago