Offshore Energy
  • news
  • test
JobsNewsletter
Offshore Energy logo

© 2026 Navingo. All rights reserved.

Home›Equipment›Construction of Nordic Maritime’s new catamaran vessel begins
Equipment

April 9, 2014 · about 12 years ago

Construction of Nordic Maritime’s new catamaran vessel begins

Incat Crowther has announced that construction has started on a 28m Catamaran Utility Vessel. Under construction at Marine Diesel Services, the vessel will be delivered to Nordic Maritime. With seating for 42 day personnel accommodation for an additional 10 overnight personnel, in addition to the

2 minutes read
  • LinkedIn
  • X
  • Email

Incat Crowther has announced that construction has started on a 28m Catamaran Utility Vessel. Under construction at Marine Diesel Services, the vessel will be delivered to Nordic Maritime.

With seating for 42 day personnel accommodation for an additional 10 overnight personnel, in addition to the vessel’s 6 operational crew, the vessel will perform seismic and crew supply roles in South East Asia.

The aft deck of the vessel measures 70sqm, with a 3t/m2 deck rating. It will be fitted out with pad eyes for towing, a 3-tonne A-Frame, an integrated winch base and a deck crane. There will also be multiple lashing points for tying down containers and other freight.

Dedicated to personnel in transit, the aft portion of the main deck cabin features a four-person cabin, changing room, bathroom, showers, medevac, seats for 42 and ample luggage racks.

Personnel accommodation continues in the starboard hull with a four-person cabin and a two-person cabin, both with en-suites.

The forward end of the main deck cabin features a crew galley and mess, as well as access to the port hull, which accommodates 6 crew in an arrangement that mirrors the personnel accommodation in the starboard hull.

The hulls also house a cool room, a pantry and a laundry, further enhancing the vessel’s long-range credentials. The vessel will be powered by a pair of Caterpillar C18 main engines, each producing 533kW. The vessel’s service speed will be 12 knots, with a top speed of 16 knots.

The vessel will be classed by ABS and is due to be delivered in the fourth quarter of 2014.

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Equipment

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1ADES jack-up rig pair lines up drilling jobs in Nigerian and UK waters
  2. 2Odfjell Drilling’s rig remaining with Norwegian oil & gas operator for another year
  3. 3Karoon boosts Brazilian field’s oil output with all wells now online
  4. 4TotalEnergies offloading Mexican shallow water block to Grupo Carso

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free