Offshore Energy
  • news
  • test
JobsNewsletter
Offshore Energy logo

© 2026 Navingo. All rights reserved.

Home›Business & Finance›AWE: Another setback at Pateke. Second sidetrack needed
Business & Finance

April 15, 2014 · about 12 years ago

AWE: Another setback at Pateke. Second sidetrack needed

Preparations are being made to drill a second sidetrack on the Pateke-4H development well, offshore New Zealand.

2 minutes read
  • LinkedIn
  • X
  • Email

AWE Limited reports that as at 6.00am NZDT today preparations are being made to drill a second sidetrack on the Pateke-4H development well, offshore New Zealand.

Operations have been unable to drill past an obstruction in the lower portion of the first sidetrack (ST-1) and a second sidetrack (ST-2) will be drilled from a measured depth of 3,587m with an 8 1/2 inch drilling assembly.

The forward work plan requires ST-2 to be drilled to a depth of approximately 4,110m and intersect the F10 reservoir at a horizontal angle of approximately 90 degrees. Drilling will continue through the F10 reservoir section to a planned total measured depth of 5,361m, following which a 6 5/8 inch production liner will be installed.

The Kapuni F10 sandstone objective has already been intersected on prognosis with oil shows and real time logging measurements indicating the likely presence of an oil bearing reservoir. The commercial significance of the oil shows will not be clear until the horizontal drilling is completed and the reservoir size and quality is fully assessed.

Based on the additional work required to mitigate the operational difficulties encountered to date, gross pre-completion well costs have increased beyond the pre-spud estimate of USD 55 million (AWE share USD 32 million). An updated estimate of pre-completion well costs will be issued after the horizontal drilling is completed and the production liner has been installed.

The Pateke-4H development well is in PMP 38158 and AWE is the Operator. Located in the offshore Taranaki Basin, New Zealand, PMP 38158 contains the Tui, Amokura and Pateke fields and has been producing since 2007.

Pateke-4H is targeting a mapped northern extension of the currently producing Pateke field. The well is being drilled in water depth of approximately 124m with a planned total measured depth of 5,361m, including a 1,272m horizontal section. If successful, the well will be completed for subsequent tie-back to the Tui FPSO (“Umuroa”) for production in 2015.

The Joint Venture partners in PMP 38158 are: AWE Limited (via subsidiaries) (Operator) 57.5% New Zealand Oil & Gas (via subsidiaries) 27.5% Pan Pacific Petroleum (via subsidiaries) 15.0%

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Business & FinanceProject & Tenders

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1ADES jack-up rig pair lines up drilling jobs in Nigerian and UK waters
  2. 2Odfjell Drilling’s rig remaining with Norwegian oil & gas operator for another year
  3. 3Karoon boosts Brazilian field’s oil output with all wells now online
  4. 4TotalEnergies offloading Mexican shallow water block to Grupo Carso

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free