Offshore Energy
  • news
  • test
JobsNewsletter
Offshore Energy logo

© 2026 Navingo. All rights reserved.

Home›Business & Finance›Goliath Installs Jacket Pin Piles at Baltic 2 Offshore Wind Farm
Business & Finance

April 15, 2014 · about 12 years ago

Goliath Installs Jacket Pin Piles at Baltic 2 Offshore Wind Farm

EnBW (Energie Baden-Württemberg AG), a German-based company, completed the installation of all jacket pin piles at Baltic 2 offshore wind farm. In an email statement the Company confirmed that the installation has been completed on the wind farm located about 32 km north of Ruegen Island in the west

1 minutes read
  • LinkedIn
  • X
  • Email

EnBW (Energie Baden-Württemberg AG), a German-based company, completed the installation of all jacket pin piles at Baltic 2 offshore wind farm.

In an email statement the Company confirmed that the installation has been completed on the wind farm located about 32 km north of Ruegen Island in the western part of the Baltic Sea.

As reNews reported, the jack-up vessel Goliath completed the work of driving the piles at the location of each of 41 jackets.

The installation of jackets is expected to start in the second or third quarter by the Taklift 4 vessel.

EnBW Baltic 2 will consist of a total of 80 wind turbines of 3.6 MW each, and will have a total capacity of 288 MW.

Subsea World News Staff, April 15, 2014; Image: DEME Group

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Business & FinanceEquipmentOperations & Maintenance

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1ADES jack-up rig pair lines up drilling jobs in Nigerian and UK waters
  2. 2Odfjell Drilling’s rig remaining with Norwegian oil & gas operator for another year
  3. 3Karoon boosts Brazilian field’s oil output with all wells now online
  4. 4TotalEnergies offloading Mexican shallow water block to Grupo Carso

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free