Offshore Energy
  • news
  • test
JobsNewsletter
Offshore Energy logo
Topics
  • News
  • Contracts & Tenders
  • Authorities & Government
  • Automation
  • Business & Finance
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›Business & Finance›Pipe No.1 for South Stream’s Offshore Section Produced
Business & Finance

April 16, 2014 · about 12 years ago

Pipe No.1 for South Stream’s Offshore Section Produced

Gazprom informed that pipe No.1 for the first line of South Stream’s offshore section was produced at the Vyksa Steel Works (part of the United Metallurgical Company – OMK). Unique pipes for South Stream’s offshore section are 12 meters long, 813 millimeters in diameter and have a wall thickness of

2 minutes read
  • LinkedIn
  • X
  • Email

Gazprom informed that pipe No.1 for the first line of South Stream’s offshore section was produced at the Vyksa Steel Works (part of the United Metallurgical Company – OMK).

Unique pipes for South Stream’s offshore section are 12 meters long, 813 millimeters in diameter and have a wall thickness of 39 millimeters. These pipes made of SAWL 450 steel are designed for the super-high operating pressure of 28.45 MPa.

Since early April, Severstal (Izhora Pipe Mill) and German EUROPIPE have also been preparing for manufacturing these pipes.

The first pipes will be delivered to Bulgarian harbors in early summer, so that the construction of the first line of South Stream’s offshore section will start in autumn 2014.

South Stream is Gazprom’s global infrastructure project aimed at constructing a gas pipeline with a capacity of 63 billion cubic meters across the Black Sea to Southern and Central Europe for the purpose of diversifying the natural gas export routes and eliminating transit risks.

South Stream’s offshore section will consist of four lines, each exceeding 930 kilometers.

Pipe supply contracts for the first line were awarded to EUROPIPE from Germany (50 per cent of the total amount), United Metallurgical Company – OMK (35 per cent) and Severstal (15 per cent) from Russia.

Pipes for the second line will be supplied by Marubeni-Itochu and Sumitomo consortium from Japan (40 per cent of the total amount), OMK (35 per cent) and Severstal (25 per cent).

Press Release, April 16, 2014; Image: Gazprom

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Business & FinanceEquipmentOperations & MaintenanceResearch & Development

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1ADES jack-up rig pair lines up drilling jobs in Nigerian and UK waters
  2. 2Odfjell Drilling’s rig remaining with Norwegian oil & gas operator for another year
  3. 3Karoon boosts Brazilian field’s oil output with all wells now online
  4. 4TotalEnergies offloading Mexican shallow water block to Grupo Carso

Related articles

FPSO Cidade de Itajaí; Source: Altera Infrastructure
Business & Finance

Karoon boosts Brazilian field’s oil output with all wells now online

24 days ago

Illustration; Source: TotalEnergies
Business & Finance

TotalEnergies offloading Mexican shallow water block to Grupo Carso

24 days ago

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

FPSO Cidade de Itajaí; Source: Altera Infrastructure
Business & Finance

Karoon boosts Brazilian field’s oil output with all wells now online

24 days ago
Illustration; Source: TotalEnergies
Business & Finance

TotalEnergies offloading Mexican shallow water block to Grupo Carso

24 days ago