Offshore Energy
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
  • More news
JobsNewsletter
Offshore Energy logo

Your trusted source for global offshore energy news, part of the Navingo network.

Topics
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
Network
  • Offshore Energy
  • Offshore Wind
  • NavalToday
  • Dredging Today
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Home›Shipbuilding›Giant Crane Installs First Leg on Van Oord’s Aeolus
Shipbuilding

April 28, 2014 · about 12 years ago

Giant Crane Installs First Leg on Van Oord’s Aeolus

Mammoet, a global provider of engineered heavy lifting and transport, is currently employing its Liebherr LR13000, the biggest crawler crane in the world, to install four platform legs on Van Oord’s newest wind turbine installation vessel, the Aeolus. In 12 days the giant crane has been assembled at

1 minutes read
  • LinkedIn
  • X
  • Email

Mammoet, a global provider of engineered heavy lifting and transport, is currently employing its Liebherr LR13000, the biggest crawler crane in the world, to install four platform legs on Van Oord’s newest wind turbine installation vessel, the Aeolus.

In 12 days the giant crane has been assembled at Lloyd Werft in Bremerhaven, Germany. The first of the four 87 meter long steel platform legs, each weighing 920 tons, has already been settled into its jacking position on the 139 meter long and 38 meter wide vessel.

For this job, Mammoet designed, fabricated and delivered tailor-made top lifting tools and a tailing frame to ensure that the legs, that have no lifting points, can be lifted securely.

In addition to the platform legs, Mammoet will also install four spudcans, using a specially engineered method. This method involves placing the partly rigged spudcans on the seabed, moving the Aeolus over it and connecting the spudcan with the leg with the use of cranes and divers.

Execution started on 22 April, and will continue round the clock for a fortnight. The Aeolus is scheduled to be operational in July of this year.

[mappress] Mammoet, April 28, 2014

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

ShipbuildingBusiness & Finance

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Ventura Offshore rig staying longer with Eni and Petronas’ Searah in Southeast Asia
  2. 2Last FSRU in seven-vessel conversion program boosts Karpowership’s LNG-to-power value chain
  3. 3SLB’s grand slam with Aramco puts over 450 oil & gas wells on its plate
  4. 4Chevron and Egypt discuss next steps to speed up Mediterranean gas project

Daily Offshore Energy News in Your Mailbox

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free