Offshore Energy
  • news
  • test
JobsNewsletter
Offshore Energy logo
Topics
  • News
  • Contracts & Tenders
  • Authorities & Government
  • Automation
  • Business & Finance
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›Business & Finance›AWE to Reach Planned Depth Soon at Pateke-4H
Business & Finance

April 29, 2014 · about 12 years ago

AWE to Reach Planned Depth Soon at Pateke-4H

AWE Limited reported that the Pateke-4H development well was at a measured depth of 4,700m and drilling ahead on a horizontal trajectory through the Kapuni F10 sandstone reservoir with an 8 1/2 inch drilling assembly. The reservoir was intersected at 4,023m and operations have drilled 677m horizonta

1 minutes read
  • LinkedIn
  • X
  • Email

AWE Limited reported that the Pateke-4H development well was at a measured depth of 4,700m and drilling ahead on a horizontal trajectory through the Kapuni F10 sandstone reservoir with an 8 1/2 inch drilling assembly.

The reservoir was intersected at 4,023m and operations have drilled 677m horizontally through the F10 reservoir section with approximately 681m remaining to reach a planned total measured depth of 5,381m, following which a 6 5/8 inch production liner will be installed.

Results to date are positive with oil shows and “real time” measurement logs consistent with pre-drill estimates. The commercial significance of Pateke-4H will be determined once horizontal drilling is completed and the reservoir size and quality is fully assessed.

The Pateke-4H development well is in PMP 38158 and AWE is the Operator. Located in the offshore Taranaki Basin, New Zealand, PMP 38158 contains the Tui, Amokura and Pateke fields and has been producing since 2007.

Pateke-4H is targeting a mapped northern extension of the currently producing Pateke field. The well is being drilled in water depth of approximately 124m with a planned total measured depth of 5,381m, including a 1,326m horizontal section. If successful, the well will be completed for subsequent tie-back to the Tui FPSO (“Umuroa”) for production in 2015.

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Business & FinanceEquipmentOperations & MaintenanceResearch & Development

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1ADES jack-up rig pair lines up drilling jobs in Nigerian and UK waters
  2. 2Odfjell Drilling’s rig remaining with Norwegian oil & gas operator for another year
  3. 3Karoon boosts Brazilian field’s oil output with all wells now online
  4. 4TotalEnergies offloading Mexican shallow water block to Grupo Carso

Related articles

Deepsea Nordkapp rig; Source: Odfjell Drilling
Business & Finance

Odfjell Drilling’s rig remaining with Norwegian oil & gas operator for another year

24 days ago

FPSO Cidade de Itajaí; Source: Altera Infrastructure
Business & Finance

Karoon boosts Brazilian field’s oil output with all wells now online

24 days ago

Illustration; Source: TotalEnergies
Business & Finance

TotalEnergies offloading Mexican shallow water block to Grupo Carso

24 days ago

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Deepsea Nordkapp rig; Source: Odfjell Drilling
Business & Finance

Odfjell Drilling’s rig remaining with Norwegian oil & gas operator for another year

24 days ago
FPSO Cidade de Itajaí; Source: Altera Infrastructure
Business & Finance

Karoon boosts Brazilian field’s oil output with all wells now online

24 days ago
Illustration; Source: TotalEnergies
Business & Finance

TotalEnergies offloading Mexican shallow water block to Grupo Carso

24 days ago