Offshore Energy
  • news
  • test
JobsNewsletter
Offshore Energy logo
Topics
  • News
  • Contracts & Tenders
  • Authorities & Government
  • Automation
  • Business & Finance
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›Business & Finance›Corps Releases Final Survey for Mattituck Inlet Dredging Scheme (USA)
Business & Finance

May 2, 2014 · about 12 years ago

Corps Releases Final Survey for Mattituck Inlet Dredging Scheme (USA)

Last week, Congressman Tim Bishop received the final survey for the Mattituck Inlet dredging project from the Army Corps of Engineers. Over 108,000 cubic yards of sand were removed from the inlet, while more than 2,300 cubic yards were dredged from the fillet. The Army Corps placed 98,251 cubic yard

1 minutes read
  • LinkedIn
  • X
  • Email

Last week, Congressman Tim Bishop received the final survey for the Mattituck Inlet dredging project from the Army Corps of Engineers.

Over 108,000 cubic yards of sand were removed from the inlet, while more than 2,300 cubic yards were dredged from the fillet. The Army Corps placed 98,251 cubic yards of sand on the beach to restore the effects of erosion.

“ The Mattituck Inlet dredging was a resounding success ,” said Congressman Bishop . “ The inlet will be easier to navigate and the beach will have been built up to a level that better protects coastal assets and recreational opportunities. Further, we will now have an established project from which to work should the beach need repair in the future.”

The final survey will be the guiding document for any potential future repairs that need to be made at the inlet or beach. Having a profile in place will allow the work to happen more quickly as a repair to an existing project, rather than starting from scratch with a new project.

The total cost of the dredging and beach nourishment at the Mattituck Inlet was about $2,5 mln.

[mappress]

Press Release, May 2, 2014

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Business & FinanceEquipmentTechnology

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1ADES jack-up rig pair lines up drilling jobs in Nigerian and UK waters
  2. 2Odfjell Drilling’s rig remaining with Norwegian oil & gas operator for another year
  3. 3Karoon boosts Brazilian field’s oil output with all wells now online
  4. 4TotalEnergies offloading Mexican shallow water block to Grupo Carso

Related articles

FPSO Cidade de Itajaí; Source: Altera Infrastructure
Business & Finance

Karoon boosts Brazilian field’s oil output with all wells now online

22 days ago

Illustration; Source: TotalEnergies
Business & Finance

TotalEnergies offloading Mexican shallow water block to Grupo Carso

22 days ago

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

FPSO Cidade de Itajaí; Source: Altera Infrastructure
Business & Finance

Karoon boosts Brazilian field’s oil output with all wells now online

22 days ago
Illustration; Source: TotalEnergies
Business & Finance

TotalEnergies offloading Mexican shallow water block to Grupo Carso

22 days ago