Offshore Energy
  • news
  • test
JobsNewsletter
Offshore Energy logo
Topics
  • News
  • Contracts & Tenders
  • Authorities & Government
  • Automation
  • Business & Finance
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›Business & Finance›Draft EIS/EIR Released for Yusen Terminals Project (USA)
Business & Finance

May 6, 2014 · about 12 years ago

Draft EIS/EIR Released for Yusen Terminals Project (USA)

The Port of Los Angeles and U.S. Army Corps of Engineers have prepared a Draft Environmental Impact Statement/Report (EIS/EIR) for the Yusen Terminals Inc. (YTI) Container Terminal Improvements Project, located at Berths 212-224 at the Port of Los Angeles, on the north side of Terminal Island along

2 minutes read
  • LinkedIn
  • X
  • Email

The Port of Los Angeles and U.S. Army Corps of Engineers have prepared a Draft Environmental Impact Statement/Report (EIS/EIR) for the Yusen Terminals Inc. (YTI) Container Terminal Improvements Project, located at Berths 212-224 at the Port of Los Angeles, on the north side of Terminal Island along the Cerritos Channel, near the East Basin.

The proposed project entails improving Berths 214-216 wharves, increasing berth depth from -45 to -53 feet, and improving Berths 217-220 wharves to make way for 100-foot gauge gantry cranes, as well as deepening to a -47 feet berth depth. The project will also construct additional on-dock rail yard capacity for YTI.

The proposed project follows in the footsteps of the Port of Los Angeles’ $370 million Main Channel Deepening Project, done in conjunction with the U.S. Army Corps of Engineers. As a result of these improvements, the Port’s main channel and turning basins now provide -53 depths.

YTI is a wholly-owned subsidiary of Nippon Yusen Kabushiki Kaisha. YTI operates marine cargo terminals in Los Angeles and Oakland, providing stevedore and terminal service to container shipping lines. YTI has a long-term lease with the Port for operation of the terminal through 2016, and plans to exercise its option to extend its lease through 2026.

The Draft EIS/EIR includes a discussion of the proposed project’s environmental impacts and identifies mitigation measures to reduce these impacts as required under the California Environmental Quality Act (CEQA).

The public comment and review period will be open until June 16, 2014.

[mappress]

Press Release, May 6, 2014

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Business & FinanceEquipmentTechnology

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1ADES jack-up rig pair lines up drilling jobs in Nigerian and UK waters
  2. 2Odfjell Drilling’s rig remaining with Norwegian oil & gas operator for another year
  3. 3Karoon boosts Brazilian field’s oil output with all wells now online
  4. 4TotalEnergies offloading Mexican shallow water block to Grupo Carso

Related articles

FPSO Cidade de Itajaí; Source: Altera Infrastructure
Business & Finance

Karoon boosts Brazilian field’s oil output with all wells now online

22 days ago

Illustration; Source: TotalEnergies
Business & Finance

TotalEnergies offloading Mexican shallow water block to Grupo Carso

22 days ago

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

FPSO Cidade de Itajaí; Source: Altera Infrastructure
Business & Finance

Karoon boosts Brazilian field’s oil output with all wells now online

22 days ago
Illustration; Source: TotalEnergies
Business & Finance

TotalEnergies offloading Mexican shallow water block to Grupo Carso

22 days ago