Offshore Energy
  • news
  • test
JobsNewsletter
Offshore Energy logo
Topics
  • News
  • Contracts & Tenders
  • Authorities & Government
  • Automation
  • Business & Finance
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›Business & Finance›Princess Bay Coastal Project Set for Next Month (New Zealand)
Business & Finance

May 22, 2014 · about 12 years ago

Princess Bay Coastal Project Set for Next Month (New Zealand)

Work is due to start next month on a concrete retaining wall to protect The Esplanade at Princess Bay from erosion caused by big seas in southerly storms. One section of footpath collapsed in February 2013 and more of the pathway was damaged in the severe southerly storm that hit Wellington last Jun

2 minutes read
  • LinkedIn
  • X
  • Email

Work is due to start next month on a concrete retaining wall to protect The Esplanade at Princess Bay from erosion caused by big seas in southerly storms.

One section of footpath collapsed in February 2013 and more of the pathway was damaged in the severe southerly storm that hit Wellington last June. A total of about 80 metres of footpath has been affected.

The Council’s City Networks Manager, Stavros Michael , said expected rises in sea level and the severity of storms due to climate change mean it is considered necessary to build a wall that will last at least 100 years while also not taking up too much space on the beach at Princess Bay.

“ We’ve looked at various options and our preferred solution is to construct a high concrete retaining wall with a smaller rock support at its base,” said Michael.

“This design will encroach only one or two metres on the beach. It will also be strong enough to add a widened suspended path for pedestrians and cyclists in the future.”

In order to build the wall, and provide beach access for machinery, some of the sand dunes and vegetation will have to be excavated. This area will be replanted and landscaped. Construction is expected to begin in June and be completed by mid-October. Public access to the beach will be restricted during this period.

Island Bay

Options for the Island Bay sea wall damaged in last year’s June storm are being explored with the community as to how this area could more readily cope with storm surges and expected rises in sea level.

These include:

– restoring the seawall as it was;

– shifting it further inland into the park and increasing the beach berm;

– removing the seawall, expanding the beach to link with Shorland Park and encouraging the return of natural sand dunes and vegetation.

To test this option, a trial road closure is proposed for The Esplanade between Reef and Derwent streets.

[mappress]

Press Release, May 22, 2014

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Business & FinanceEquipmentTechnology

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1ADES jack-up rig pair lines up drilling jobs in Nigerian and UK waters
  2. 2Odfjell Drilling’s rig remaining with Norwegian oil & gas operator for another year
  3. 3Karoon boosts Brazilian field’s oil output with all wells now online
  4. 4TotalEnergies offloading Mexican shallow water block to Grupo Carso

Related articles

Illustration; Source: TotalEnergies
Business & Finance

TotalEnergies offloading Mexican shallow water block to Grupo Carso

23 days ago

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Illustration; Source: TotalEnergies
Business & Finance

TotalEnergies offloading Mexican shallow water block to Grupo Carso

23 days ago