Offshore Energy
  • news
  • test
JobsNewsletter
Offshore Energy logo
Topics
  • News
  • Contracts & Tenders
  • Authorities & Government
  • Automation
  • Business & Finance
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›Business & Finance›Australia: Burnett River Dredging Wrapped Up
Business & Finance

May 27, 2014 · about 12 years ago

Australia: Burnett River Dredging Wrapped Up

Neumann Contractors have recently completed dredging works in Queensland’s Burnett River near Kirby’s Wall. The job involved deepening the navigational channel and placement of the material behind “Kirby’s Wall”. Neumann performed the work using their 450mm cutter suction dredger Nu Endeavour couple

1 minutes read
  • LinkedIn
  • X
  • Email

Neumann Contractors have recently completed dredging works in Queensland’s Burnett River near Kirby’s Wall. The job involved deepening the navigational channel and placement of the material behind “Kirby’s Wall”.

Neumann performed the work using their 450mm cutter suction dredger Nu Endeavour coupled to a spreader barge for placement.

The work was required following recent severe flooding, with joint funding provided by the Qld Department of Transport and Main Roads and the Department of Natural Resources and Mines.

The Burnett River was severely impacted by flooding in January 2013. Dredging was required to restore the depth of the river’s navigational channels adjacent to Kirby’s Wall. A total of 65,700 cubic metres of sand and gravel was removed from the channels and placed behind Kirby’s Wall.

Two specific dredge areas were nominated by TMR:

– Dredge Area A, adjacent and upstream of Kirby’s Wall required 36,000m3 of material to be removed;

– Dredge Area B, downstream of Kirby’s Wall with almost 30,000m3.

Both dredge areas were required to be dredge to a maximum depth of 2.3m below LAT. The dredged material was required to be placed behind Kirby’s Wall to fill in the area between the river bank and the rock wall.

[mappress]

Press Release, May 27, 2014

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Business & FinanceEquipmentTechnology

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1ADES jack-up rig pair lines up drilling jobs in Nigerian and UK waters
  2. 2Odfjell Drilling’s rig remaining with Norwegian oil & gas operator for another year
  3. 3Karoon boosts Brazilian field’s oil output with all wells now online
  4. 4TotalEnergies offloading Mexican shallow water block to Grupo Carso

Related articles

FPSO Cidade de Itajaí; Source: Altera Infrastructure
Business & Finance

Karoon boosts Brazilian field’s oil output with all wells now online

23 days ago

Illustration; Source: TotalEnergies
Business & Finance

TotalEnergies offloading Mexican shallow water block to Grupo Carso

23 days ago

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

FPSO Cidade de Itajaí; Source: Altera Infrastructure
Business & Finance

Karoon boosts Brazilian field’s oil output with all wells now online

23 days ago
Illustration; Source: TotalEnergies
Business & Finance

TotalEnergies offloading Mexican shallow water block to Grupo Carso

23 days ago