Offshore Energy
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
  • More news
JobsNewsletter
Offshore Energy logo
Topics
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
Network
  • Offshore Energy
  • Offshore Wind
  • NavalToday
  • Dredging Today
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Home›Wind Farms›First TP Installed at Butendiek Offshore Wind Farm
Wind Farms

June 9, 2014 · about 12 years ago

First TP Installed at Butendiek Offshore Wind Farm

The first of a total of 80 transition pieces (TP) at the Butendiek offshore wind farm has been installed. Transition pieces, manufactured by Bladt Industries in Esbjerg, Denmark, are being installed by the DP heavy-lift vessel Jumbo Javelin from Jumbo Shipping. Each TP weighs approximately 330 tons,

1 minutes read
  • LinkedIn
  • X
  • Email

The first of a total of 80 transition pieces (TP) at the Butendiek offshore wind farm has been installed.

Transition pieces, manufactured by Bladt Industries in Esbjerg, Denmark, are being installed by the DP heavy-lift vessel Jumbo Javelin from Jumbo Shipping.

Each TP weighs approximately 330 tons, it measures 31m in height and has a diameter of 5.5m. To install such TPs safely, Jumbo has invested in increased lifting height capability by acquiring a 700 ton SWL Fly-Jib.

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Wind FarmsNews

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1Norwegian PSV to continue current charter for additional 100 days
  2. 2Italy’s NextGeo to open office in Germany
  3. 3TotalEnergies finds more oil off Angola, enters two exploration blocks
  4. 4Odfjell Drilling’s new rig busy until 2031 thanks to deal with Vår Energi

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free