Offshore Energy
  • news
  • test
JobsNewsletter
Offshore Energy logo
Topics
  • News
  • Contracts & Tenders
  • Authorities & Government
  • Automation
  • Business & Finance
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›Storage›HelWin Beta Topside Ready to Go
Storage

June 9, 2014 · about 12 years ago

HelWin Beta Topside Ready to Go

Heerema has successfully loaded the HVDC topside of Siemens’ HelWin beta platform onto a seagoing barge. On Saturday, the HelWin beta topside was loaded onto the H-542 barge, operated by Heerema Marine Contractors, a sister division of Heerema Fabrication Group, which built the platform. In October

1 minutes read
  • LinkedIn
  • X
  • Email

Heerema has successfully loaded the HVDC topside of Siemens’ HelWin beta platform onto a seagoing barge.

On Saturday, the HelWin beta topside was loaded onto the H-542 barge, operated by Heerema Marine Contractors, a sister division of Heerema Fabrication Group, which built the platform.

In October 2012, Heerema started the construction of the 10,200-ton HVDC topside at its Zwijndrecht yard, after the company won the contract from Siemens in June 2012. The jacket for the platform was built at Heerema’s Vlissingen yard, and was recently installed at its offshore site.

The HelWin bèta topside measures 98 meters in length, 42 meters in width and 28 meters in height, with a transmission capacity of 690 MW.

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

StorageTechnology

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1ADES jack-up rig pair lines up drilling jobs in Nigerian and UK waters
  2. 2Odfjell Drilling’s rig remaining with Norwegian oil & gas operator for another year
  3. 3Karoon boosts Brazilian field’s oil output with all wells now online
  4. 4TotalEnergies offloading Mexican shallow water block to Grupo Carso

Related articles

Visual SeaKite for FPSO GranMorgu; Source: SBM Offshore
Business & Finance

Wind-assisted towing on the cards for SBM Offshore’s Suriname-bound FPSO

13 days ago

Illustration; Source: Halliburton
Automation

Eni, Halliburton cheer Asia-Pacific’s first integrated closed-loop rig automation milestone

13 days ago

Kongsberg Maritime to acquire Sweden’s Berg Propulsion
Business & Finance

Kongsberg Maritime to acquire Sweden’s Berg Propulsion

15 days ago

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Visual SeaKite for FPSO GranMorgu; Source: SBM Offshore
Business & Finance

Wind-assisted towing on the cards for SBM Offshore’s Suriname-bound FPSO

13 days ago
Illustration; Source: Halliburton
Automation

Eni, Halliburton cheer Asia-Pacific’s first integrated closed-loop rig automation milestone

13 days ago
Kongsberg Maritime to acquire Sweden’s Berg Propulsion
Business & Finance

Kongsberg Maritime to acquire Sweden’s Berg Propulsion

15 days ago