Offshore Energy
  • news
  • test
JobsNewsletter
Offshore Energy logo
Topics
  • News
  • Contracts & Tenders
  • Authorities & Government
  • Automation
  • Business & Finance
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›Business & Finance›The Philippines: Calmay River Dredging Progresses According to Plan
Business & Finance

June 11, 2014 · about 12 years ago

The Philippines: Calmay River Dredging Progresses According to Plan

The dredging operation at the heavily silted Calmay River has so far excavated some 3,600 cubic meters of silt and sediment equivalent to 224 truckloads after just four weeks. This was bared during a meeting called by Dagupan City Mayor Belen Fernandez with officials of the Department of Public Work

1 minutes read
  • LinkedIn
  • X
  • Email

The dredging operation at the heavily silted Calmay River has so far excavated some 3,600 cubic meters of silt and sediment equivalent to 224 truckloads after just four weeks.

This was bared during a meeting called by Dagupan City Mayor Belen Fernandez with officials of the Department of Public Works and Highways (DPWH) and City Engineer’s Office.

The dredging of the city’s rivers spearheaded by the DPWH will greatly reduce flood occurring in Dagupan’s downtown and adjacent area as it will result in faster flow of water to the Lingayen Gulf from the upland.

The silt collected by the brand new Watermaster Classic IV and the dredge Visaya was deposited in private lots from where it can be sourced out as filling materials for flood-prone areas.

Jose dela Cruz, chief of the Equipment Management Division of DPWH Region I, said the dredging operation is continuing.

Meanwhile, the repair of another DPWH dredging machine that arrived is expected to be completed by the end of June.

After this, it will join the two other dredging machines and with the three simultaneously operating, expected to be collected are more than 250,000 cubic meters of silt in a year.

[mappress]

Press Release, June 11, 2014

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Business & FinanceEquipmentTechnology

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1ADES jack-up rig pair lines up drilling jobs in Nigerian and UK waters
  2. 2Odfjell Drilling’s rig remaining with Norwegian oil & gas operator for another year
  3. 3Karoon boosts Brazilian field’s oil output with all wells now online
  4. 4TotalEnergies offloading Mexican shallow water block to Grupo Carso

Related articles

FPSO Cidade de Itajaí; Source: Altera Infrastructure
Business & Finance

Karoon boosts Brazilian field’s oil output with all wells now online

23 days ago

Illustration; Source: TotalEnergies
Business & Finance

TotalEnergies offloading Mexican shallow water block to Grupo Carso

23 days ago

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

FPSO Cidade de Itajaí; Source: Altera Infrastructure
Business & Finance

Karoon boosts Brazilian field’s oil output with all wells now online

23 days ago
Illustration; Source: TotalEnergies
Business & Finance

TotalEnergies offloading Mexican shallow water block to Grupo Carso

23 days ago