Offshore Energy
  • news
  • test
JobsNewsletter
Offshore Energy logo
Topics
  • News
  • Contracts & Tenders
  • Authorities & Government
  • Automation
  • Business & Finance
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›Business & Finance›USA: Stevenson’s Creek Dredging Wrapped Up
Business & Finance

June 22, 2014 · about 12 years ago

USA: Stevenson’s Creek Dredging Wrapped Up

May 30, 2014, marked the end of a 6 month dredging project in Stevenson’s Creek, Clearwater, FL. Gator Dredging (the United States Army Corp of Engineers approved dredging contractor for Stevenson’s Creek) has successfully completed their hydraulic dredging project as part of the extensive effort to

1 minutes read
  • LinkedIn
  • X
  • Email

May 30, 2014, marked the end of a 6 month dredging project in Stevenson’s Creek, Clearwater, FL.

Gator Dredging (the United States Army Corp of Engineers approved dredging contractor for Stevenson’s Creek) has successfully completed their hydraulic dredging project as part of the extensive effort to enhance water quality and remove sediment build-up in the Stevenson’s Creek Estuary.

The project scope consisted of dredging of approximately 105,000 cubic yards of sediment from the canal. “Reach 1” called for the removal of 63,000 cubic yards of muck/sand material. This encompassed an area approximately 1,700 linear feet long, to a depth limit of -3.5 feet NGVD. “Reach 2” included the removal of an additional 42,000 cubic yards of muck/sand material for approximately 1900 linear feet, to a depth limit of -2.5 feet NGVD.

Gator Dredging successfully developed and executed USACE approved material management plan that processed the dredged material and transported the separated sediment to designated disposal sites. This process included placing dewatered muck material on an upland site located approximately 21 miles northeast of the project. The plan also called for the placement of clean, sandy material to be reused on location. This material created 15,488 square yards of mangrove habitat in Stevenson’s Creek Reaches 1 and 2.

Gator Dredging’s engineers developed, maintained, and restored the designated processing site and staging area located near the easterly limit of project.

[mappress]

Press Release, June 22, 2014

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Business & FinanceEquipmentTechnology

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1ADES jack-up rig pair lines up drilling jobs in Nigerian and UK waters
  2. 2Odfjell Drilling’s rig remaining with Norwegian oil & gas operator for another year
  3. 3Karoon boosts Brazilian field’s oil output with all wells now online
  4. 4TotalEnergies offloading Mexican shallow water block to Grupo Carso

Related articles

FPSO Cidade de Itajaí; Source: Altera Infrastructure
Business & Finance

Karoon boosts Brazilian field’s oil output with all wells now online

24 days ago

Illustration; Source: TotalEnergies
Business & Finance

TotalEnergies offloading Mexican shallow water block to Grupo Carso

24 days ago

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

FPSO Cidade de Itajaí; Source: Altera Infrastructure
Business & Finance

Karoon boosts Brazilian field’s oil output with all wells now online

24 days ago
Illustration; Source: TotalEnergies
Business & Finance

TotalEnergies offloading Mexican shallow water block to Grupo Carso

24 days ago