Offshore Energy
  • news
  • test
JobsNewsletter
Offshore Energy logo
Topics
  • News
  • Contracts & Tenders
  • Authorities & Government
  • Automation
  • Business & Finance
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›Business & Finance›Dredge Central Delivers Equipment Package
Business & Finance

June 25, 2014 · about 12 years ago

Dredge Central Delivers Equipment Package

Dredge Central, LLC has completed and delivered three 18-inch booster pump assemblies to Construcciones José, S.A. de C.V., of Mazatlan, Sinaloa. These boosters will be placed into service on a long-pipeline project in the State of Sonora, dredging 1,310,000 cubic yards (1,000,000 cu.m) of sand to a

1 minutes read
  • LinkedIn
  • X
  • Email

Dredge Central, LLC has completed and delivered three 18-inch booster pump assemblies to Construcciones José, S.A. de C.V., of Mazatlan, Sinaloa.

These boosters will be placed into service on a long-pipeline project in the State of Sonora, dredging 1,310,000 cubic yards (1,000,000 cu.m) of sand to a maximum discharge distance of approximately 23,000 ft (7,000m).

Each booster consists of an 18”x 18” Georgia Iron Works dredge pump, powered by a Caterpillar Model 3508 diesel engine, with V-belt drive. All components except for the dredge pumps (supplied with new impellers) and the diesel engines, are new.

The entire new assembly is warranted by Dredge Central, LLC for 90 days.

This contractor also elected to include a remote control package, Kruse Integration’s AUTOBOOST system, which allows the dredge operator to monitor and coordinate the boosters from a laptop computer in the dredge control room. The cost for this option also includes on-site set-up and training by Kruse’s field technical personnel.

These three large booster assemblies, complete with the remote control packages, were purchased by the contractor for less than $400,000 each.

Dredge Central also sold another large, high-powered 18-inch booster for work on another long-line project in Belize. This package will feature a 1620-hp Caterpillar 3512 engine driving through a Twin Disc marine gear.

[mappress]

Press Release, June 25, 2014

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Business & FinanceEquipmentTechnology

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1ADES jack-up rig pair lines up drilling jobs in Nigerian and UK waters
  2. 2Odfjell Drilling’s rig remaining with Norwegian oil & gas operator for another year
  3. 3Karoon boosts Brazilian field’s oil output with all wells now online
  4. 4TotalEnergies offloading Mexican shallow water block to Grupo Carso

Related articles

FPSO Cidade de Itajaí; Source: Altera Infrastructure
Business & Finance

Karoon boosts Brazilian field’s oil output with all wells now online

24 days ago

Illustration; Source: TotalEnergies
Business & Finance

TotalEnergies offloading Mexican shallow water block to Grupo Carso

24 days ago

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

FPSO Cidade de Itajaí; Source: Altera Infrastructure
Business & Finance

Karoon boosts Brazilian field’s oil output with all wells now online

24 days ago
Illustration; Source: TotalEnergies
Business & Finance

TotalEnergies offloading Mexican shallow water block to Grupo Carso

24 days ago