Offshore Energy
  • news
  • test
JobsNewsletter
Offshore Energy logo
Topics
  • News
  • Contracts & Tenders
  • Authorities & Government
  • Automation
  • Business & Finance
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›Business & Finance›AWE: Oi-2 Soon to Be Drilled to Primary Objective
Business & Finance

July 1, 2014 · about 12 years ago

AWE: Oi-2 Soon to Be Drilled to Primary Objective

AWE Limited, as Operator of Petroleum Mining Permit 38158 offshore Taranaki, New Zealand, reports that, as at 06:00 hours (6.00am) NZDT today, the Oi-2 exploration well was at a measured depth of 1,505 metres. The 9 5/8” casing string has been installed and cemented at a depth of 1,487 metres. Prepa

2 minutes read
  • LinkedIn
  • X
  • Email

AWE Limited, as Operator of Petroleum Mining Permit 38158 offshore Taranaki, New Zealand, reports that, as at 06:00 hours (6.00am) NZDT today, the Oi-2 exploration well was at a measured depth of 1,505 metres.

The 9 5/8” casing string has been installed and cemented at a depth of 1,487 metres. Preparations are underway to start drilling ahead to the primary objective, the F10 sandstones anticipated at 3,690 metres.

Well costs have been adversely impacted by winter weather conditions in the offshore Taranaki Basin, with the total cost of the Oi-1 and Oi-2 wells now estimated at US$50.9 million (AWE share US$15.9 million), which includes a contingent provision for weather downtime.

The Oi-2 exploration well is located approximately 12 kilometres northeast of the Tui Area Oil Fields in water depth of approximately 120 metres. The well objective is to evaluate the hydrocarbon potential of a 4-way dip closed structure similar to the producing Tui, Amokura and Pateke fields and is targeting the same F10 reservoir sandstones.

The Oi-2 exploration well will be drilled vertically to a planned total depth of 3,881 metres and is forecast to take approximately 40 days to complete.

The Joint Venture partners in PMP 38158 are: AWE Limited (via subsidiaries) (Operator) 57.50%; New Zealand Oil & Gas (via subsidiaries) 27.50%; Pan Pacific Petroleum (via subsidiaries) 15.00%.

The Joint Venture partners in the Oi-2 exploration well are: AWE Limited (via subsidiaries) (Operator) 31.25%; New Zealand Oil & Gas (via subsidiaries) 18.75%; Pan Pacific Petroleum (via subsidiaries) 50.00%.

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Business & FinanceOperations & MaintenanceResearch & Development

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1ADES jack-up rig pair lines up drilling jobs in Nigerian and UK waters
  2. 2Odfjell Drilling’s rig remaining with Norwegian oil & gas operator for another year
  3. 3Karoon boosts Brazilian field’s oil output with all wells now online
  4. 4TotalEnergies offloading Mexican shallow water block to Grupo Carso

Related articles

FPSO Cidade de Itajaí; Source: Altera Infrastructure
Business & Finance

Karoon boosts Brazilian field’s oil output with all wells now online

26 days ago

Illustration; Source: TotalEnergies
Business & Finance

TotalEnergies offloading Mexican shallow water block to Grupo Carso

26 days ago

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

FPSO Cidade de Itajaí; Source: Altera Infrastructure
Business & Finance

Karoon boosts Brazilian field’s oil output with all wells now online

26 days ago
Illustration; Source: TotalEnergies
Business & Finance

TotalEnergies offloading Mexican shallow water block to Grupo Carso

26 days ago