Offshore Energy
  • news
  • test
JobsNewsletter
Offshore Energy logo
Topics
  • News
  • Contracts & Tenders
  • Authorities & Government
  • Automation
  • Business & Finance
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›Technology›Photo of the Day: Installation of Nordsee Ost’s First Wind Turbine
Technology

July 2, 2014 · about 12 years ago

Photo of the Day: Installation of Nordsee Ost’s First Wind Turbine

Offshore WIND’s photo of the day: The installation of the first wind turbine at RWE’s Nordsee Ost offshore wind farm. The rotor blades for the Senvion 6MW wind turbine were not preassembled into a rotor spider, but were fitted to the hub at the Nordsee Ost construction site at sea. The Nordsee Ost o

1 minutes read
  • LinkedIn
  • X
  • Email

Offshore WIND’s photo of the day: The installation of the first wind turbine at RWE’s Nordsee Ost offshore wind farm.

The rotor blades for the Senvion 6MW wind turbine were not preassembled into a rotor spider, but were fitted to the hub at the Nordsee Ost construction site at sea.

The Nordsee Ost offshore wind farm, located about 30 kilometres north of the island of Heligoland, will feature 48 wind turbines – enough to supply around 300,000 households with power in a year. The installation of the turbines is scheduled to be completed this year and wind farm commissioning is expected to be carried out in September.

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Technology

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1ADES jack-up rig pair lines up drilling jobs in Nigerian and UK waters
  2. 2Odfjell Drilling’s rig remaining with Norwegian oil & gas operator for another year
  3. 3Karoon boosts Brazilian field’s oil output with all wells now online
  4. 4TotalEnergies offloading Mexican shallow water block to Grupo Carso

Related articles

Visual SeaKite for FPSO GranMorgu; Source: SBM Offshore
Business & Finance

Wind-assisted towing on the cards for SBM Offshore’s Suriname-bound FPSO

26 days ago

Illustration; Source: Halliburton
Automation

Eni, Halliburton cheer Asia-Pacific’s first integrated closed-loop rig automation milestone

26 days ago

Kongsberg Maritime to acquire Sweden’s Berg Propulsion
Business & Finance

Kongsberg Maritime to acquire Sweden’s Berg Propulsion

28 days ago

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Visual SeaKite for FPSO GranMorgu; Source: SBM Offshore
Business & Finance

Wind-assisted towing on the cards for SBM Offshore’s Suriname-bound FPSO

26 days ago
Illustration; Source: Halliburton
Automation

Eni, Halliburton cheer Asia-Pacific’s first integrated closed-loop rig automation milestone

26 days ago
Kongsberg Maritime to acquire Sweden’s Berg Propulsion
Business & Finance

Kongsberg Maritime to acquire Sweden’s Berg Propulsion

28 days ago