Offshore Energy
  • news
  • test
JobsNewsletter
Offshore Energy logo

© 2026 Navingo. All rights reserved.

Home›Business & Finance›Ichthys FPSO hull launched
Business & Finance

July 7, 2014 · about 12 years ago

Ichthys FPSO hull launched

Japan’s INPEX announced today it launched the hull of the floating production, storage and offloading (FPSO) facility for the INPEX-operated Ichthys LNG Project from the dry dock at the Daewoo Shipbuilding and Marine Engineering (DSME) shipyard in Geoje, South Korea. The launch on Sunday, 6 July, sa

2 minutes read
  • LinkedIn
  • X
  • Email

Japan’s INPEX announced today it launched the hull of the floating production, storage and offloading (FPSO) facility for the INPEX-operated Ichthys LNG Project from the dry dock at the Daewoo Shipbuilding and Marine Engineering (DSME) shipyard in Geoje, South Korea.

The launch on Sunday, 6 July, saw the 336-metre-long hull – equivalent to more than three soccer fields in length – floated out of the dry dock and positioned quayside where construction will continue. Ichthys LNG Project offshore Director Claude Cahuzac said the milestone was an impressive achievement, with an enormous amount of work carried out since the FPSO’s keel laying ceremony. “Pre-fabricated blocks weighing around 60,000 tonnes in total have been lifted into the dry dock and assembled to create the full-size FPSO hull we see on the water today,” Cahuzac said.

“While the hull is now at its full length from stern to bow and floating, it does not mean the FPSO is complete. We still have some work to do to complete the hull, and even more for the entire FPSO, including the fabrication and integration of the topsides, living quarters and our next major milestone – the installation of the turret, which is currently under construction in Singapore.”

The FPSO will be moored about 3.5 kilometres from the Ichthys LNG Project’s Central Processing Facility (CPF). It will process and store condensate from the CPF and periodically offload stabilised condensate to shuttle carriers for export directly to market.

The 336 m by 59 m FPSO is designed to hold more than one million barrels of condensate and will have the capacity to accommodate a workforce of up to 200 people. Once complete, the facility will be towed 5,600 km to the Ichthys Field in the Browse Basin, offshore Western Australia, where it will be permanently moored to the seabed for the life of the Project. The Ichthys LNG Project recently celebrated its most significant construction milestone to date after officially marking 50 per cent completion on 25 June 2014.

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Business & FinanceProject & Tenders

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1ADES jack-up rig pair lines up drilling jobs in Nigerian and UK waters
  2. 2Odfjell Drilling’s rig remaining with Norwegian oil & gas operator for another year
  3. 3Karoon boosts Brazilian field’s oil output with all wells now online
  4. 4TotalEnergies offloading Mexican shallow water block to Grupo Carso

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free