Offshore Energy
  • news
  • test
JobsNewsletter
Offshore Energy logo

© 2026 Navingo. All rights reserved.

Home›Project & Tenders›Iran: Topside for South Pars Phase 12 completed
Project & Tenders

July 8, 2014 · about 12 years ago

Iran: Topside for South Pars Phase 12 completed

A topside destined for Phase 12 of South Pars gas field in southern Iran has been lifted for delivery.

1 minutes read
  • LinkedIn
  • X
  • Email

A topside destined for Phase 12 of South Pars gas field in southern Iran has been lifted for delivery.

The lifting was carried out on Monday at Khorramshahr Yard in southwestern Iran in the presence of senior officials.

The topside has been designed and constructed by Iran’s Offshore Engineering and Construction Company (IOEC) engineers.

The 3,250-ton topside is to be installed within a week.

When platforms A, B and C of Phase 12 of South Pars become operational, Iran’s gas output will rise by 62.5 mcm. Topsides are under construction for other phases of South Pars, the massive offshore gas field shared by Iran and Qatar.

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Project & Tenders

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1ADES jack-up rig pair lines up drilling jobs in Nigerian and UK waters
  2. 2Odfjell Drilling’s rig remaining with Norwegian oil & gas operator for another year
  3. 3Karoon boosts Brazilian field’s oil output with all wells now online
  4. 4TotalEnergies offloading Mexican shallow water block to Grupo Carso

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free