Offshore Energy
  • news
  • test
JobsNewsletter
Offshore Energy logo
Topics
  • News
  • Contracts & Tenders
  • Authorities & Government
  • Automation
  • Business & Finance
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›Business & Finance›Cairn Breaks Off with Blackford Dolphin, 3D Survey to Go Ahead
Business & Finance

July 9, 2014 · about 12 years ago

Cairn Breaks Off with Blackford Dolphin, 3D Survey to Go Ahead

Providence Resources has provided an operational update on activities in FEL 2/04, FEL 4/08 and FEL 1/14, which are all located within Quadrant 35 in the northern Porcupine Basin. Capricorn Ireland Limited (38%, Operator (wholly owned subsidiary of Cairn Energy PLC)) operates these licences on behal

2 minutes read
  • LinkedIn
  • X
  • Email

Providence Resources has provided an operational update on activities in FEL 2/04, FEL 4/08 and FEL 1/14, which are all located within Quadrant 35 in the northern Porcupine Basin.

Capricorn Ireland Limited (38%, Operator (wholly owned subsidiary of Cairn Energy PLC)) operates these licences on behalf of its partners, Providence Resources (32%), Chrysaor E&P Ireland (26%) and Sosina Exploration (4%). The licences, which cover an area of c. 2,000 km2, are located c. 175 km off the west coast of Ireland in water depths of c. 400 metres.

The Operator has advised that the Spanish Point appraisal well will not be drilled in 2014, as previously planned. Extensive delays in the refurbishment of the Blackford Dolphin drilling rig which had been scheduled to drill the well, mean that drilling operations would not be able to begin until at least October, thereby putting the Spanish Point drilling operations into the winter period. Accordingly, the Operator has advised that the contract with Dolphin for the Blackford Dolphin has been terminated and tendering for another rig to carry out the planned well operations in 2015 has started.

Separately, the Operator has confirmed that, subject to regulatory approval, a large 3D seismic acquisition programme over blocks 35/13, 35/14, 35/15, 35/18 and 35/19 in FEL 1/14 (“Spanish Point South”) will go ahead this summer.

Commenting on today’s update, Tony O’Reilly, Chief Executive of Providence, said: “The postponement of appraisal drilling at Spanish Point is regrettable and beyond the control of the partnership. As the rig refurbishment delays became apparent, the Operator evaluated various options to re-schedule the Blackford Dolphin rig and/or to secure another drilling unit for 2014, but this proved unsuccessful. Our ability to commence drilling in the autumn was further constrained by the rig’s operational capabilities at the Spanish Point location during winter and thus the decision was taken to terminate the contract and seek a new drilling unit for 2015. This procurement process has commenced and we will provide further updates as they are confirmed by the Operator.”

“Separately, we are pleased to confirm that, subject to regulatory approval, the planned 3D seismic surveying programme over Spanish Point South is going ahead as originally scheduled and we plan to provide an update on the survey over the coming period.”

Press Release, July 09, 2014

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Business & FinanceEquipmentOperations & MaintenanceResearch & Development

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1ADES jack-up rig pair lines up drilling jobs in Nigerian and UK waters
  2. 2Odfjell Drilling’s rig remaining with Norwegian oil & gas operator for another year
  3. 3Karoon boosts Brazilian field’s oil output with all wells now online
  4. 4TotalEnergies offloading Mexican shallow water block to Grupo Carso

Related articles

FPSO Cidade de Itajaí; Source: Altera Infrastructure
Business & Finance

Karoon boosts Brazilian field’s oil output with all wells now online

26 days ago

Illustration; Source: TotalEnergies
Business & Finance

TotalEnergies offloading Mexican shallow water block to Grupo Carso

26 days ago

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

FPSO Cidade de Itajaí; Source: Altera Infrastructure
Business & Finance

Karoon boosts Brazilian field’s oil output with all wells now online

26 days ago
Illustration; Source: TotalEnergies
Business & Finance

TotalEnergies offloading Mexican shallow water block to Grupo Carso

26 days ago