Offshore Energy
  • news
  • test
JobsNewsletter
Offshore Energy logo

© 2026 Navingo. All rights reserved.

Home›Business & Finance›Doedijns’ UCS for Gina Krog Launch Jacket
Business & Finance

July 10, 2014 · about 12 years ago

Doedijns’ UCS for Gina Krog Launch Jacket

Doedijns has recently received an order to supply the complete Upending Control System (UCS) for the Gina Krog Launch jacket currently being fabricated at the Heerema yard in Vlissingen. Weighing 17.000 tons with a height of 142 meters, a footprint of 60 x 50 meters and a top of 40 x 30 meter, the G

2 minutes read
  • LinkedIn
  • X
  • Email

Doedijns has recently received an order to supply the complete Upending Control System (UCS) for the Gina Krog Launch jacket currently being fabricated at the Heerema yard in Vlissingen.

Weighing 17.000 tons with a height of 142 meters, a footprint of 60 x 50 meters and a top of 40 x 30 meter, the Gina Krog jacket is the largest launch jacket ever built at Heerema Fabrication Group’s Vlissingen yard. The the jacket will be ready for Sail Away in April 2015.

With the advent of the very large platforms developed for offshore oil use today it is no longer a matter of simply opening a few valves and lifting the top of the platform with a derrick barge to upend it. The sheer weight of these structures (17.000 tonnes in the case of the Gina Krog jacket) is beyond the capacity of the largest offshore crane ships operating today.

Even with a fleet of large lift cranes, the coordination and perfect sea conditions required would make a lift-flood method impractical and very expensive.

Because of the large-size and cost of these platforms which must be set accurately in place under less than ideal sea conditions, much effort is required to design, detail, construct and operate reliable and versatile flooding systems.

Doedijns will supply the complete Upending Control System which includes a Hydraulic Power Unit incl. control panels to control the flooding and venting valves, an umbilical and reeler, hosing and valves and actuators.

Doedijns has gained in-depth knowledge of UCS’s and has supplied a number of systems over the years. A UCS can also include a Deck Control Centre (DCC) and Umbilical Interface Panel in the form of a pressure capsule.

The Upending Control System will be delivered to Heerema Vlissingen in Q3/2014. Final-customer of the Gina Krog jacket is Statoil Petroleum ASA. The jacket is destined for the Gina Krog field development in the Norwegian central part of the North Sea.

Doedijns Business Development Manager EMEA, Martijn Schols commented: “This project is an example of the complex solutions we provide to our clients. Projects like this allow us to demonstrate our innovation and leadership in control automation and process packages whilst consolidating our position in the marketplace.”

Press Release, July 10, 2014

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Business & FinanceEquipment

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1ADES jack-up rig pair lines up drilling jobs in Nigerian and UK waters
  2. 2Odfjell Drilling’s rig remaining with Norwegian oil & gas operator for another year
  3. 3Karoon boosts Brazilian field’s oil output with all wells now online
  4. 4TotalEnergies offloading Mexican shallow water block to Grupo Carso

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free