Offshore Energy
  • news
  • test
JobsNewsletter
Offshore Energy logo
Topics
  • News
  • Contracts & Tenders
  • Authorities & Government
  • Automation
  • Business & Finance
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›Business & Finance›Corps Conducts Geotechnical Analysis on Rio Grande Levee
Business & Finance

August 13, 2014 · about 12 years ago

Corps Conducts Geotechnical Analysis on Rio Grande Levee

The United States Section of the International Boundary and Water Commission (USIBWC) has hired experts from the U.S. Army Corps of Engineers to conduct geotechnical investigations on the U.S. Rio Grande flood control levee near Brownsville, Texas. The USIBWC requested the work after cracks were det

1 minutes read
  • LinkedIn
  • X
  • Email

The United States Section of the International Boundary and Water Commission (USIBWC) has hired experts from the U.S. Army Corps of Engineers to conduct geotechnical investigations on the U.S. Rio Grande flood control levee near Brownsville, Texas.

The USIBWC requested the work after cracks were detected this spring in a part of the levee located 80-100 feet from the Rio Grande. The cracks pose no immediate flood risk at current river levels and are considered safe under conditions similar to the 2010 flood.

During that flood, the worst in 43 years, floodwaters did not reach the affected levee segment.

The cracks, which are primarily located at or near the top part of the levee, run generally parallel to the river within an 800 foot segment near the Gateway International Bridge. The deep cracks are several inches wide in some locations. USIBWC discovered the cracks during a routine levee inspection. Other cracks have been noted in the floodplain along the river and on a nearby service road.

The Corps personnel conducted an initial site visit June 30 – July 3 and began detailed geotechnical investigations at the end of July. The investigations are intended to determine the cause of the cracking and, if necessary, develop possible repair solutions.

The Corps is scheduled to complete its investigations and make preliminary recommendations by October.

[mappress]

Press Release, August 13, 2014

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Business & FinanceEquipmentTechnology

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1ADES jack-up rig pair lines up drilling jobs in Nigerian and UK waters
  2. 2Odfjell Drilling’s rig remaining with Norwegian oil & gas operator for another year
  3. 3Karoon boosts Brazilian field’s oil output with all wells now online
  4. 4TotalEnergies offloading Mexican shallow water block to Grupo Carso

Related articles

FPSO Cidade de Itajaí; Source: Altera Infrastructure
Business & Finance

Karoon boosts Brazilian field’s oil output with all wells now online

25 days ago

Illustration; Source: TotalEnergies
Business & Finance

TotalEnergies offloading Mexican shallow water block to Grupo Carso

25 days ago

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

FPSO Cidade de Itajaí; Source: Altera Infrastructure
Business & Finance

Karoon boosts Brazilian field’s oil output with all wells now online

25 days ago
Illustration; Source: TotalEnergies
Business & Finance

TotalEnergies offloading Mexican shallow water block to Grupo Carso

25 days ago