Offshore Energy
  • news
  • test
JobsNewsletter
Offshore Energy logo
Topics
  • News
  • Contracts & Tenders
  • Authorities & Government
  • Automation
  • Business & Finance
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›Business & Finance›Siemens Late with Turbine Delivery for Borkum Riffgrund 1
Business & Finance

August 21, 2014 · about 12 years ago

Siemens Late with Turbine Delivery for Borkum Riffgrund 1

Dong Energy’s 312MW offshore wind farm Borkum Riffgrund 1 has encountered an obstacle, as Siemens cannot deliver the 77 wind turbines on time, Danish media reported. The 4 MW turbine is an upgraded version of Siemens’ bestseller 3.6 MW, which was originally slated to be used at Borkum Riffgrund 1. I

1 minutes read
  • LinkedIn
  • X
  • Email

Dong Energy’s 312MW offshore wind farm Borkum Riffgrund 1 has encountered an obstacle, as Siemens cannot deliver the 77 wind turbines on time, Danish media reported.

The 4 MW turbine is an upgraded version of Siemens’ bestseller 3.6 MW, which was originally slated to be used at Borkum Riffgrund 1. In the spring, Dong announced that it would use the 4MW turbines to boost the capacity. Now, that became the source of problems.

Siemens confirmed to the media that there were some difficulties during the serial production of the 4MW turbines, so the installation will be delayed by a few weeks.

The delay also means that A2SEA’s installation vessel “SEA INSTALLER” is inactive and waiting to start with the installation. However, Dong Energy believes that the overall schedule to finish the project in the first half of 2015 will be met.

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Business & FinanceTechnology

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1ADES jack-up rig pair lines up drilling jobs in Nigerian and UK waters
  2. 2Odfjell Drilling’s rig remaining with Norwegian oil & gas operator for another year
  3. 3Karoon boosts Brazilian field’s oil output with all wells now online
  4. 4TotalEnergies offloading Mexican shallow water block to Grupo Carso

Related articles

Deepsea Nordkapp rig; Source: Odfjell Drilling
Business & Finance

Odfjell Drilling’s rig remaining with Norwegian oil & gas operator for another year

25 days ago

FPSO Cidade de Itajaí; Source: Altera Infrastructure
Business & Finance

Karoon boosts Brazilian field’s oil output with all wells now online

25 days ago

Illustration; Source: TotalEnergies
Business & Finance

TotalEnergies offloading Mexican shallow water block to Grupo Carso

25 days ago

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Deepsea Nordkapp rig; Source: Odfjell Drilling
Business & Finance

Odfjell Drilling’s rig remaining with Norwegian oil & gas operator for another year

25 days ago
FPSO Cidade de Itajaí; Source: Altera Infrastructure
Business & Finance

Karoon boosts Brazilian field’s oil output with all wells now online

25 days ago
Illustration; Source: TotalEnergies
Business & Finance

TotalEnergies offloading Mexican shallow water block to Grupo Carso

25 days ago