Offshore Energy
  • news
  • test
JobsNewsletter
Offshore Energy logo
Topics
  • News
  • Contracts & Tenders
  • Authorities & Government
  • Automation
  • Business & Finance
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›Technology›Bang-Up Job Done on Pioneering Offshore Wind Project
Technology

August 29, 2014 · about 12 years ago

Bang-Up Job Done on Pioneering Offshore Wind Project

The companies that installed an innovative foundation on DONG Energy’s Borkum Riffgrund 1 offshore wind farm can mark another great milestone for their businesses after the first offshore wind Suction Bucket Jacket stands at its position. GeoSea carried out the floating load out, transport and insta

1 minutes read
  • LinkedIn
  • X
  • Email

The companies that installed an innovative foundation on DONG Energy’s Borkum Riffgrund 1 offshore wind farm can mark another great milestone for their businesses after the first offshore wind Suction Bucket Jacket stands at its position.

GeoSea carried out the floating load out, transport and installation, while the suction process was done by SPT Offshore. Armour stones will be installed soon by GeoSea’s sister company Tideway.

The installation vessel Pacific Orca , supplied by DONG Energy, is currently demobilizing in Eemshaven.

After installing 77 monopile foundations for Borkum Riffgrund 1 at the end of July, the Pacific Orca demobilized at BOW Terminal and mobilized for the job on the 78th foundation, the suction bucket jacket.

The suction bucket jacket design consists of three legs welded together in a jacket structure, standing on top of three giant suction buckets anchoring the foundation to the seabed. It is a lightweight structure that only requires a single operation when the foundation is installed offshore, reducing the time of the installation and hence contributing to lowering the costs of electricity from offshore wind.

When fully operational in 2015, Borkum Riffgrund 1 will be able to supply green power corresponding to the annual consumption of approximately 320,000 German households.

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Technology

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1ADES jack-up rig pair lines up drilling jobs in Nigerian and UK waters
  2. 2Odfjell Drilling’s rig remaining with Norwegian oil & gas operator for another year
  3. 3Karoon boosts Brazilian field’s oil output with all wells now online
  4. 4TotalEnergies offloading Mexican shallow water block to Grupo Carso

Related articles

Visual SeaKite for FPSO GranMorgu; Source: SBM Offshore
Business & Finance

Wind-assisted towing on the cards for SBM Offshore’s Suriname-bound FPSO

28 days ago

Illustration; Source: Halliburton
Automation

Eni, Halliburton cheer Asia-Pacific’s first integrated closed-loop rig automation milestone

28 days ago

Kongsberg Maritime to acquire Sweden’s Berg Propulsion
Business & Finance

Kongsberg Maritime to acquire Sweden’s Berg Propulsion

about 1 month ago

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Visual SeaKite for FPSO GranMorgu; Source: SBM Offshore
Business & Finance

Wind-assisted towing on the cards for SBM Offshore’s Suriname-bound FPSO

28 days ago
Illustration; Source: Halliburton
Automation

Eni, Halliburton cheer Asia-Pacific’s first integrated closed-loop rig automation milestone

28 days ago
Kongsberg Maritime to acquire Sweden’s Berg Propulsion
Business & Finance

Kongsberg Maritime to acquire Sweden’s Berg Propulsion

about 1 month ago