Offshore Energy
  • news
  • test
JobsNewsletter
Offshore Energy logo
Topics
  • News
  • Contracts & Tenders
  • Authorities & Government
  • Automation
  • Business & Finance
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›Business & Finance›UPDATE: Upper Hudson River Dredging in Full Swing
Business & Finance

September 1, 2014 · about 12 years ago

UPDATE: Upper Hudson River Dredging in Full Swing

The upper Hudson River dredging project, administered by the United States Environmental Protection Agency (EPA) and General Electric (GE), will be in progress during the 2014 Navigation Season between Lock C-4 in Stillwater and Lock C-8 in Fort Edward. The dredging operations are lighted, have day

1 minutes read
  • LinkedIn
  • X
  • Email

The upper Hudson River dredging project, administered by the United States Environmental Protection Agency (EPA) and General Electric (GE), will be in progress during the 2014 Navigation Season between Lock C-4 in Stillwater and Lock C-8 in Fort Edward.

The dredging operations are lighted, have day shapes and arrow boards displayed. Additional informational signs have been posted in the project area.

Activities planned for this week are:

– Barge unloading operations immediately south of Lock C-8;

– Barge loading operations immediately north of Lock C-5;

– Project hazard buoys marking shallow water areas just outside the navigational channel are located just north of buoy Green 133;

– No Wake buoys in the land cut north of Lock 6 marking the no wake zone established in the vicinity of the Isthmus Transfer Area;

– Norwegian buoys indicating shallow water areas located outside the navigational channel are located between buoy Red 72 and Red 66;

– Dredging operations between approximately buoy Red 88 and Green 77;

– Dredging operations between approximately buoy Red 68 and Red 66;

– Backfill/capping operations between approximately buoy Green 121 and Red 118;

– Backfill/capping operations between approximately buoy Red 110 and Green 89.

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Business & FinanceEquipmentTechnology

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1ADES jack-up rig pair lines up drilling jobs in Nigerian and UK waters
  2. 2Odfjell Drilling’s rig remaining with Norwegian oil & gas operator for another year
  3. 3Karoon boosts Brazilian field’s oil output with all wells now online
  4. 4TotalEnergies offloading Mexican shallow water block to Grupo Carso

Related articles

Illustration; Source: TotalEnergies
Business & Finance

TotalEnergies offloading Mexican shallow water block to Grupo Carso

26 days ago

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Illustration; Source: TotalEnergies
Business & Finance

TotalEnergies offloading Mexican shallow water block to Grupo Carso

26 days ago