Offshore Energy
  • news
  • test
JobsNewsletter
Offshore Energy logo
Topics
  • News
  • Contracts & Tenders
  • Authorities & Government
  • Automation
  • Business & Finance
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›Business & Finance›Another Shipment for New Locks Arrives in Panama
Business & Finance

September 8, 2014 · about 12 years ago

Another Shipment for New Locks Arrives in Panama

The third shipment of four gates for the new locks of the Panama Canal Expansion has arrived to the Atlantic entrance of the waterway. The four gates were delivered on Sunday by the Post-Panamax vessel Xia Zhi Yuan 6, owned by COSCO Ocean Shipping. The shipment began its journey from Trieste, Italy

2 minutes read
  • LinkedIn
  • X
  • Email

The third shipment of four gates for the new locks of the Panama Canal Expansion has arrived to the Atlantic entrance of the waterway.

The four gates were delivered on Sunday by the Post-Panamax vessel Xia Zhi Yuan 6, owned by COSCO Ocean Shipping. The shipment began its journey from Trieste, Italy on August 17 before crossing the Atlantic Ocean to reach the entrance of the Panama Canal, where they will be unloaded onto a special temporary dock.

Only one shipment is left to receive all 16 gates required for the Third Set of Locks project.

Gate Features

These gates will be used in the new locks at the Pacific side of the Canal.

Two of the gates are 57.6 m long, 10 m wide and 31.92 m high, and weigh 4,163 tons each. These are the heaviest of the 16 rolling gates to be used in the expanded Canal.

The other two gates are 57.6 m long, 8 m wide and 22.3 m high, and weigh 2,867 tons each.

The construction of the gates began in October 2011 by subcontractor Cimolai SpA. The new locks will have a total of 16 rolling gates (eight for each new lock complex). Unlike the current Canal, which uses miter gates, the expanded Canal will have rolling gates.

The first gate shipment arrived in Panama on August 20, 2013 and the second on June 10, 2014. The final shipment is expected to arrive in January 2015.

Grupo Unidos por el Canal, S.A. (GUPC) is the contractor for the Design and Construction of the Third Set of Locks. All gates must be in Panama by February 2015, as agreed between the ACP and the contractor.

The Panama Canal Expansion is 79 percent complete. It involves the construction of a third lane of traffic allowing the passage of bigger vessels, which will double the Canal’s capacity and have an important impact on world maritime trade.

[mappress]

Press Release, September 8, 2014

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Business & FinanceEquipmentProject & TendersTechnology

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1ADES jack-up rig pair lines up drilling jobs in Nigerian and UK waters
  2. 2Odfjell Drilling’s rig remaining with Norwegian oil & gas operator for another year
  3. 3Karoon boosts Brazilian field’s oil output with all wells now online
  4. 4TotalEnergies offloading Mexican shallow water block to Grupo Carso

Related articles

Illustration; Source: TotalEnergies
Business & Finance

TotalEnergies offloading Mexican shallow water block to Grupo Carso

26 days ago

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

Illustration; Source: TotalEnergies
Business & Finance

TotalEnergies offloading Mexican shallow water block to Grupo Carso

26 days ago