Offshore Energy
  • news
  • test
JobsNewsletter
Offshore Energy logo
Topics
  • News
  • Contracts & Tenders
  • Authorities & Government
  • Automation
  • Business & Finance
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Home›Business & Finance›USA: Toms River Project Slated for Early Spring
Business & Finance

September 8, 2014 · about 12 years ago

USA: Toms River Project Slated for Early Spring

All of the beaches in Ocean County will have their dunes and beaches replenished by the U.S. Army Corps of Engineers starting early next year. Toms River Township officials met with members of the Army Corps of Engineers to learn the latest details of the massive $100 million plus project. After goi

1 minutes read
  • LinkedIn
  • X
  • Email

All of the beaches in Ocean County will have their dunes and beaches replenished by the U.S. Army Corps of Engineers starting early next year.

Toms River Township officials met with members of the Army Corps of Engineers to learn the latest details of the massive $100 million plus project. After going to out to bid for contracts, construction is slated to begin in the late winter or early spring (on or before 3/1/15).

“ It’s imperative we get this project done to reduce our risk of coastal storm damage and strengthen our infrastructure,” said Mayor Thomas Kelaher . “ The Township will keep maintaining temporary dunes until the Army Corps project is complete.”

Part of the holdup on the project was the reluctance of some homeowners to sign over the necessary easements allowing the Army Corps to access part of their private beaches. To date, there are only three homeowners in Toms River who have not consented to the project.

Kelaher said that the Township is in the process of using eminent domain to procure the easements needed, but the legal procedure is just part of what delayed the project.

When complete, residents will see 25-foot dunes and 200 foot-long beaches from the Manasquan Inlet to the end of South Seaside Park. The Army Corps will also maintain the beaches for the next 50 years.

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Business & FinanceEquipmentTechnology

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1ADES jack-up rig pair lines up drilling jobs in Nigerian and UK waters
  2. 2Odfjell Drilling’s rig remaining with Norwegian oil & gas operator for another year
  3. 3Karoon boosts Brazilian field’s oil output with all wells now online
  4. 4TotalEnergies offloading Mexican shallow water block to Grupo Carso

Related articles

FPSO Cidade de Itajaí; Source: Altera Infrastructure
Business & Finance

Karoon boosts Brazilian field’s oil output with all wells now online

26 days ago

Illustration; Source: TotalEnergies
Business & Finance

TotalEnergies offloading Mexican shallow water block to Grupo Carso

26 days ago

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free

Related news

FPSO Cidade de Itajaí; Source: Altera Infrastructure
Business & Finance

Karoon boosts Brazilian field’s oil output with all wells now online

26 days ago
Illustration; Source: TotalEnergies
Business & Finance

TotalEnergies offloading Mexican shallow water block to Grupo Carso

26 days ago