Offshore Energy
  • news
  • test
JobsNewsletter
Offshore Energy logo

© 2026 Navingo. All rights reserved.

Home›Business & Finance›Tideway Rollingstone to Recommence Scour Protection Work at Gwynt y Môr
Business & Finance

September 12, 2014 · about 12 years ago

Tideway Rollingstone to Recommence Scour Protection Work at Gwynt y Môr

Scour protection work is due to recommence within the Gwynt y Môr Offshore Windfarm on the 21st September 2014. As AWJ Marine informs, the work will be carried out by the vessel Tideway Rollingstone. All vessel traffic is asked to keep at least 500m clear of Tideway Rollingstone. Gwynt y Môr will co

1 minutes read
  • LinkedIn
  • X
  • Email

Scour protection work is due to recommence within the Gwynt y Môr Offshore Windfarm on the 21st September 2014.

As AWJ Marine informs, the work will be carried out by the vessel Tideway Rollingstone.

All vessel traffic is asked to keep at least 500m clear of Tideway Rollingstone.

Gwynt y Môr will consist of 160 turbines and is being built by RWE Innogy UK (formerly RWE npower renewables) in Liverpool Bay, off the North Wales coast.

Once operational, Gwynt y Môr will have an installed capacity of 576MW, using Siemens 3.6MW turbines and generators.

It will be capable of generating enough energy to meet the average annual energy needs of around 400,000 homes.

The wind farm is due to be fully operational by the end of 2014.

Press Release, September 12, 2014; Image: Shipspotting

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Business & FinanceOperations & Maintenance

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1ADES jack-up rig pair lines up drilling jobs in Nigerian and UK waters
  2. 2Odfjell Drilling’s rig remaining with Norwegian oil & gas operator for another year
  3. 3Karoon boosts Brazilian field’s oil output with all wells now online
  4. 4TotalEnergies offloading Mexican shallow water block to Grupo Carso

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free