Offshore Energy
  • news
  • test
JobsNewsletter
Offshore Energy logo

© 2026 Navingo. All rights reserved.

Home›Business & Finance›UPDATE: Lodgemore Dredging Project on Track
Business & Finance

September 18, 2014 · about 12 years ago

UPDATE: Lodgemore Dredging Project on Track

Land & Water Services are making excellent progress dredging the canal between Wallbridge Lower Lock and Lodgemore Bridge. The first work boats in eighty years recently arrived on this stretch of water. Two brand new mud hoppers and a mini push tug are also in the place. The mud hoppers were manufac

2 minutes read
  • LinkedIn
  • X
  • Email

Land & Water Services are making excellent progress dredging the canal between Wallbridge Lower Lock and Lodgemore Bridge.

The first work boats in eighty years recently arrived on this stretch of water. Two brand new mud hoppers and a mini push tug are also in the place.

The mud hoppers were manufactured in Birmingham. They will be used to transfer dredged material along the length of newly navigable water.

Cost saving ingenuity

An ingenious cost saving and environmentally sound method of retaining the material on site has been adopted. The northern bank margin which borders onto the rear aspect of Homebase has been reshaped to provide the repository for hundreds of cubic metres of silt.

Environmental benefits explained

Senior Site Manager Chris Spencer said: “Off-site disposal of dredged material to landfill is expensive. So, to save costs for Stroud District Council, we have re-shaped the north bank by creating a flat top, a sort of shelf if you like… We then created a raised bank at the front of the shelf and along its full length. The long reach of the WK80 tracked amphibious excavator allows us to move the material up onto the new flat area behind the banked edge. This process allows the silt to drain and go firm.”

Next step

Wallbridge Lower Lock is due for refurbishment in Spring 2015. However, some time is to be saved by the Land & Water team whilst they are on site. The company has been tasked with removing the dangerously tilted wall overhanging the lock and to clear material from the lock itself. This will also provide a clearer picture of the structural integrity of the lock.

Funding

Work along this stretch is being funded with the assistance of a £100,000 grant from the Veolia Environmental Trust.

Reach the Offshore Energy industry in one go!

Offshore Energy is read by thousands of professionals every day.

Increase your visibility with banners, tell your story with a branded article, and showcase your expertise with a full-page company profile in our business directory.

CONTACT

Follow Offshore Energy on:

Filed under

Business & FinanceEquipmentTechnology

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Trending Now

  1. 1ADES jack-up rig pair lines up drilling jobs in Nigerian and UK waters
  2. 2Odfjell Drilling’s rig remaining with Norwegian oil & gas operator for another year
  3. 3Karoon boosts Brazilian field’s oil output with all wells now online
  4. 4TotalEnergies offloading Mexican shallow water block to Grupo Carso

Home of Energy Transition

Join thousands of industry professionals who start their day with our newsletter.

Subscribe free